Verilog Tutorial. Chin-Lung Su ( 蘇錦榮). Laboratory for Reliable Computing (LaRC) Electrical Engineering Department National Tsing Hua University. Outline. Introduction Combinational Circuit Programming style How to program Test-bench. Introduction. Hardware Description Language (HDL)

1 / 42

Télécharger la présentation

Verilog Tutorial

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Verilog Tutorial Chin-Lung Su (蘇錦榮) Laboratory for Reliable Computing (LaRC) Electrical Engineering Department National Tsing Hua University

  2. Outline • Introduction • Combinational Circuit • Programming style • How to program • Test-bench

  3. Introduction • Hardware Description Language (HDL) • Verilog is useful and popular language • Parallel not serial (Not like C language) • Meaningful declaration • parameter, port name, module name, … • Identifies • “Even” and “even” are different

  4. Structure Programming

  5. Module • Module is a block of circuit • Special function • and, or, mux, adder, … • Most important • Input and Output Module

  6. Flow • What functions are you want to program ? • Input and output • Separate the whole circuit into smaller ones • Each block has its own function / purpose B1 B2 B3

  7. Scenario Stimulus & Control Signal Response & Verification Test-Bench Module Monitor Signals

  8. Verilog Model

  9. Module Declaration • module module_name(input1, input2, …, output1, output2, …) • Example • module mux2(a, b, c); • module adder(x, y, z); endmodule

  10. Datatypes • Nests • Wire • C[1:0] = {a,b} • Registers • reg • Integers • 4’d3, 4’b0100, 6’h20 • Array • reg [9:0] ram • Parameter • parameter word_size = 16 • wire [word_size-1:0] bus; • Preprocessor Directive • `define BEQ 4’b0100 No “=”

  11. Synthesizable Description

  12. Un-synthesizable Description

  13. Synthesizable Operator • Binary Bitwise operator • ~ inverse • & and • | or • ^ XOR • ~^ XNOR • Example • Assign a=~b; if b = 4’b0010; then a = 4’b1101;

  14. y z 0 1 x y z 1 0 0 0 0 0 1 0 1 0 0 1 1 1 x y z 0 0 0 0 1 1 1 0 1 1 1 1 Logic x y x x z z y y

  15. Example • assign a=b & c • assgin a=b | c b = 4’b0011 c = 4’b0101 a = 4’b0001 b = 4’b0011 c = 4’b0101 a = 4’b0111

  16. a + Mux s - b op Program 1 • Purpose • A circuit can calculate the addition and subtraction of two 8 bits numbers • Three inputs and one output

  17. Program 1 (cont.) /* A first program in Verilog */ module adder_or_subtract( a, b, op, s); parameter SIZE = 8; parameter ADD = 1’b1; input op; input [SIZE-1:0] a,b; output [SIZE-1:0] s; wire add, sub; assign add = a+b; assign sub = a-b; assign s = (op==ADD)? add : sub; endmodule comment Model declaration add a + Mux s - sub b op

  18. Program 1 (cont.) module adder_or_subtract( a, b, op, s); parameter SIZE = 8; parameter ADD = 1’b1; input op; input [SIZE-1:0] a,b; output [SIZE-1:0] s; assign s = (op==ADD)? A+b : a-b; endmodule

  19. D y0 y0 z1 Select 0 D 0 y1 1 0 D Select Program 2 • 1-to-2 De-multiplexer

  20. Program 2 (cont.) /* A deMux program in Verilog */ module demux ( D, select, y0, y1); input D; input select; output y0,y1; wire y0,y1; assign y0 = (~select) & D; assign y1 = select & D; endmodule comment Model declaration

  21. B1 B2 B3 Sub Module • Complex circuit • Many modules in a circuit • Module, sub-module, sub-sub-module, …

  22. B1 B2 B3 Example of Call Module • module B1(a, b, c); ……………….. • endmodule • module B2(a, b, c, d); ……………….. • endmodule • module B3(x, y, z); ……………….. • endmodule

  23. Example of Call Module (cont.) • module function(q, w, e, f); • ……. • B1 b1(q, w, a, b, c); • B2 b2(a, b, d, e); • B3 b3(c, d, f); • …… • endmodule • module B1(a, b, c); ……………….. • endmodule • module B2(a, b, c, d); ……………….. • endmodule • module B3(x, y, z); ……………….. • endmodule

  24. B1 w q c q w f a e Port Mapping Between Modules • # of ports need the same • Width of each port needs the same • module function(a,b,c,d); • ……. • B1 b1(w, q, a, c); • endmodule • module B1(q, w, e, f); • input q, w; • input [3:0] e; • output [1:0] f; • ………………. • endmodule

  25. Port Mapping Between Modules (cont.) • Port name should match the name in sub_module • Prot connection • module_name( .port1_m1(w1_or_r1), .port2_m1(w2_or_r2), .port3_m1(w3_or_r3), .port4_m1(w4_or_r4), ) • module_name( .port3_m1(w3_or_r3), .port2_m1(w2_or_r2), .port1_m1(w1_or_r1), .port4_m1(w4_or_r4), )

  26. Connection Between Modules (cont.) • Prot connection B1 q q • module function(a,b,c,d); • B1 b1(q, w, a, c); • B1 b1(.q(q), .w(w), .e(a), .f(c)) • B1 b1(.w(w), .q(q), .e(a), .f(c)) • endmodule c w w f a e • module B1(q, w, e, f); • input q, w; • input [3:0] e; • output [1:0] f; • ………………. • endmodule

  27. Reuse Module • Using the same module many times • Example • Constructing 4-bits adder with four 1-bit adder b3 a3 b2 a2 b1 a1 b0 a0 A A A A c3 c2 c1 0 s4 s3 s2 s1 s0

  28. 4-bists Adder • module Adder(x, y, cin, sum, cout); • input x, y, c; • output sum, cout; • wire x, y, c, sum, cout; • assign sum = x ^ y ^ cin; • assign cout = (x & y) | (x & cin) | (y & cin); • assign {cout, sum} = x + y + cin; • endmodule y x A cout cin sum

  29. 4-bists Adder (cont.) b3 a3 b2 a2 b1 a1 b0 a0 • module Adder4(x, y, cin, sum); • input [3:0]x, y • input cin; • output [4:0]sum; • wire [3:0] x, y; wire cin; • wire [4:0] sum; • wire c1, c2, c3; • Adder A1(x[0], y[0], cin, sum[0], c1); • Adder A2(x[1], y[1], c1, sum[1], c2); • Adder A3(x[2], y[2], c2, sum[2], c3); • Adder A4(x[3], y[3], c3, sum[3], sum[4]); • endmodule A A A A cin c3 c2 c1 s3 s2 s1 s0 s4

  30. Mistake • module and endmodule • module();而不是Module(); • 每一行漏加分號(;) • port 數目及bus寬度不對

  31. Always Block • Syntax • always @(event-expression) assignment or block • Level type • always @(a or b or c) • Edge type • always @(posedge clock) • always @(negedge clock) • if-else and case statement are only in always block • wire and reg

  32. Example • wire a; • reg b; • always @(x or y or z) • begin • a <= x & y; • b <= x | z; • end error correct

  33. D y0 y1 Select Program 2 (cont.) /* A deMux program in Verilog */ module demux ( D, select, y0, y1); input D, select; output y0,y1; reg y0,y1; always @( D or select ) begin if( select == 1’b0)begin y0 = D; y1 = 1’b0; end else begin y0 = 1’b0; y1 = D; end end endmodule

  34. Blocking and Non-blocking • Symbol • Blocking “ = ” • Non-blocking “<=” A = B B = A A <= B B <= A A A B B

  35. Blocking and Non-blocking

  36. if statement • Like C language • Only in always block reg out; always @(sel or a or b) begin if(sel == 1’b1) out = a; else out = b; end wire out; assign out = (sel)? a : b;

  37. Using of case and casex • Multiplexer or selection • Inside always block • All possible condition always @(sel or a or b or c or d) begin case (sel[1:0] ) 2’b00 : out <= a; 2’b01 : out <= b; 2’b10 : out <= c; 2’b11 : out <= d; endcase end a b out c d Sel [1:0]

  38. a b out c Sel [1:0] a b out c d Sel [2:0] Using of case and casex (cont.) always @(sel or a or b or c or d) begin case (sel[1:0] ) 2’b00, 2’b11 : out <= a; 2’b01 : out <= b; 2’b10 : out <= c; endcase end always @(sel or a or b or c or d) begin casex (sel[2:0] ) 3’b011 : out <= a; 3’b00x : out <= b; 3’b100 : out <= c; default : out <= d; endcasex end All others

  39. Delay and Critical Path • Each gate and wire may cause delay of circuit • Longest path of the circuit is critical path • Speed of whole circuit • Shorten the critical path can speedup the circuit • Input data rate higher than the speed of circuit may cause some problems

  40. a b c d + + + e + Z Critical Path Example • 5 inputs adder • Z = a + b + c + d + e Z = (a + b) + (c + d) + e a b + c + d Four adders Three adders + e + Z

  41. Test-bench • Input data of the circuit • All inputs of original circuit are assigned “reg” • Store data • All outputs of original circuit are assigned “wire” • Assign inputs in different time • Define time scale

  42. Test-bench Example • `timescale 1ns/100fs • module Adder_testbench; • reg [3:0] x,y; reg cin; wire [4:0] sum; • adder4 add(.x(x), .y(y), .cin(cin), .sum(sum)); • initial begin • #0 x = 4’d0; y = 4’d0; cin=1’b0; • #10 x = 4’d3; • # 5 y = 4’d10; • #10 x = 4’d1; y = 4’d5; • end • endmodule Initialization In 10ns x=3; y=0; sum=3; In 25ns x=1; y=5; sum=6; In 15ns x=3; y=10; sum=13; module Adder4(x, y, cin, sum);