E N D
Project Book / Xavier Nieto Pascual MAIN PROJECTS / 2016 • Budget: 350.000 EUR. • Location: Olympic Channel, Madrid, Spain. • Figures: BMS to supervise all the electric installation of the Olympic Broadcasting System. • Design all the IT System • Program all the devices to transform the Modbus serial protocol to Modbus/TCP • Coordinate with Sales Representative to determine and/or clarify project requirements to ensure quality output. • Understand, analyze, document, and communicate contractual, technical and commercial terms and conditions relative to the company standard. • Incorporate use of technological capabilities to improve processes and efficiency. • Perform all the graphical part including all the customer request. • Analyse of TCP/IP communications over LAN MAIN PROJECT CHARACTERISTICS TASKS AND RESPONSIBILITIES
Project Book / Xavier Nieto Pascual MAIN PROJECTS / 2016 • Budget: 100.000 EUR. • Location: Ullastres, Madrid, Spain. • Figures: BMS to supervise all the installation of Ullastres. Report data from SQL server. • Coordinate with Sales Representative to determine and/or clarify project requirements to ensure quality output. • Review customer specifications to ensure quote is technically compatible and competitive. • Incorporate use of technological capabilities to improve processes and efficiency. • Global BMS with Big Data and SQL Server. • Create a report to analyze the information of each installation. • Perform all the graphical part including all the customer request. • Analyse of TCP/IP communications over Internet. MAIN PROJECT CHARACTERISTICS TASKS AND RESPONSIBILITIES
Project Book / Xavier Nieto Pascual MAIN PROJECTS / 2015 • Budget: 100.000 EUR. • Location: MutuaIntercomarcal, Barcelona, Spain. • Figures: Lighting, HVAC and metering of the offices in MutuaIntercomarcal. • Match products to customer specifications by demonstrating knowledge of products. • Review customer specifications to ensure quote is technically compatible and competitive. • Coordinate with Sales Representative to determine and/or clarify project requirements to ensure quality output. • Analyse of TCP/IP communications over Internet. • Incorporate use of technological capabilities to improve processes and efficiency. • Perform all the graphical part including all the customer request. • Assist outside sales representatives in the preparation of customer presentations related to the quote, including comments on exceptions and built in value. • Supervise the system installation in all the offices. MAIN PROJECT CHARACTERISTICS TASKS AND RESPONSIBILITIES
Project Book / Xavier Nieto Pascual MAIN PROJECTS / 2014 • Budget: 100.000 €. • Location: Parador de León, León, Spain. • Figures: Lightning, HVAC and metering control with SmartStruxure and SmartStruxure Lite control. • Communication performance test with Zigbee PRO protocol in the rooms. • Propose and analyse different control scenarios. • Communication test to SmartStruxure Solution. • Analyse of TCP/IP communications over LAN. • Analyse and solve pending issues required by the final client at the installations. • Technical documentation about the control installation. MAIN PROJECT CHARACTERISTICS TASKS AND RESPONSIBILITIES
Project Book / Xavier Nieto Pascual MAIN PROJECTS / 2014 • Budget: 10.000 EUR. • Location: Cepsa, Getafe, Spain. • Figures: Lighting, HVAC and metering of the gas station. • Assist outside sales representatives in the preparation of customer presentations related to the quote, including comments on exceptions and built in value. • Match products to customer specifications by demonstrating knowledge of products. • Review customer specifications to ensure quote is technically compatible and competitive. • Coordinate with Sales Representative to determine and/or clarify project requirements to ensure quality output. • Understand, analyze, document, and communicate contractual, technical and commercial terms and conditions relative to the company standard. • Incorporate use of technological capabilities to improve processes and efficiency. • Supervise the system installation in Getafe, Madrid and perform test with an IP public connection. MAIN PROJECT CHARACTERISTICS TASKS AND RESPONSIBILITIES
Project Book / Xavier Nieto Pascual MAIN PROJECTS / 2014 • Budget: 50.000 EUR. • Location: Hotel Marriot, Mallorca, Spain. • Figures: HVAC control with SmartStruxure Lite with SmartStruxure platform. • Review customer specifications ensuring quote is technically compatible and competitive. • Coordinate with Sales Representative to determine and/or clarify project requirements to ensure quality output. • Understand, analyze, document, and communicate contractual, technical and commercial terms and conditions relative to the company standard. • Incorporate use of technological capabilities to improve processes and efficiency. • Assist outside sales representatives in the preparation of customer presentations related to the quote, including comments on exceptions and built in value. • Analyze the signal range because is a wireless solution technology in the room part. • Supervise the control installation done by the system integrator. MAIN PROJECT CHARACTERISTICS TASKS AND RESPONSIBILITIES
Project Book / Xavier Nieto Pascual MAIN PROJECTS / 2013 • Budget: 500.000 €. • Location: Gran Canaria Airport. • Figures: Lightning, HVAC and metering control with SmartStruxure to Wonderware software. • Communication performance test with BACnet and Modbus protocol. • Propose and analyse different control scenarios. • Communication and performance test to Wonderware software. • Define IT architecture to connect Automation Server to Wonderware. • Analyse and solve pending issues require by the final client at the airport installation. MAIN PROJECT CHARACTERISTICS TASKS AND RESPONSIBILITIES
Project Book / Xavier Nieto Pascual MAIN PROJECTS / 2012 • Budget: 100.000 EUR. • Location: Schneider Electric, Barcelona, Spain. • Figures: Homologation of Automation Servers as a official BACnet IP controller in Gas Natural • Prepare technical documents (Tested Documented Validated Architecture, presentation). • Perform a demo to test the BACnet connectivity. • Coordinate and verify with the client all the specifications to the test. • Supervise the execution of the demo test. • Analyse and solve pending issues in the demo. • Represent the company to the customer during the different tests. • Analyse of TCP/IP communications over Internet. MAIN PROJECT CHARACTERISTICS TASKS AND RESPONSIBILITIES
Project Book / Xavier Nieto Pascual MAIN PROJECTS / 2012 • Perform the first communication test with all the platform products. • Test all the communication protocols of the control solution (BACnet, Zigbee PRO, Enocean, Modbus, Web Services). • Prepare technicaldocumentation and trainings (specs, costs, estimates,operation manuals, TDVA). • Coordinate and verifythe range with the wireless protocols Zigbee PRO and Enocean. • Supervise the execution of works related to this platform. • Analyse of TCP/IP communications over Internet to cloud. • Analyse and resolve pending issues imposed by the final client at the installations. • Represent the company as a country technical leader. • Budget: 200.000 EUR. • Location: Schneider Electric, Spain, Barcelona. • Figures: Launch control platform, SmartStruxure Lite. MAIN PROJECT CHARACTERISTICS TASKS AND RESPONSIBILITIES
Project Book / Xavier Nieto Pascual MAIN PROJECTS / 2011 • Budget: 100.000 EUR. • Location: UOC, Barcelona, Spain. • Figures: Updatethe web-site “Information to theStudent” • Prepare all the web sites in the Internet portal. • Choose and design the web style with CSS. • Management the content of the web with the software OPENCMS. • Perform all the links to the other UOC web sites. • Provide support, as requested, to all the teachers in the university. • Program the teacher academy request with HTML, JAVASCRIPT and PHP. MAIN PROJECT CHARACTERISTICS TASKS AND RESPONSIBILITIES