1 / 44

Nuclear power in the seismic zone: assessing risk in Indonesian nuclear power proposals

Nuclear power in the seismic zone: assessing risk in Indonesian nuclear power proposals. Richard Tanter and Arabella Imhoff Nautilus Institute RMIT. Outline. Why research Indonesian nuclear power? Suspects with nuclear form and rising misperceptions Nuclear reactors - existing and planned

Télécharger la présentation

Nuclear power in the seismic zone: assessing risk in Indonesian nuclear power proposals

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Nuclear power in the seismic zone: assessing risk in Indonesian nuclear power proposals Richard Tanter and Arabella Imhoff Nautilus Institute RMIT

  2. Outline • Why research Indonesian nuclear power? Suspects with nuclear form and rising misperceptions • Nuclear reactors - existing and planned • The Muria peninsula NPP proposal • Rationales: climate change; energy security; cost • Risk 1. Financial • Risk 2. Regulation and safety • Risk 3. Seismic and tectonic risk • Politics - nuclear pushers, nuclear resisters, & state of play • Australia and proliferation risk: De-escalating threats and fantasies

  3. Suspects with nuclear form • Both Indonesia and Australia had secret nuclear weapons programs in the middle Cold War period • Indonesia: 1960-1965 - never serious; ended with coup • Australia: 1950s - 1972 - very serious; ended by US insistence over NPT • RAAF institutional memory • F-111s still reflect planning for nuclear delivery capability from 1963 decisions • Indonesia has not forgotten • Current revival of Australian thinking about the nuclear weapon option in part stimulated by assumptions about Indonesian proliferation risk

  4. Existing Indonesian research reactors

  5. Reactors under discussion

  6. Planned nuclear power reactor sites

  7. Sites in Java considered for a nuclear power plant since 1980

  8. Gunung Muria peninsula sites

  9. Muria Peninsula, Central Java

  10. Desa Balong, Jepara, Muria Peninsula

  11. Cove on the northern edge of the planned site

  12. Edge of the Balong site, looking east

  13. Northern edge of the Balong site

  14. Rationales for the nuclear choice • Electricity crisis >>> increase supply at appropriate prices • Indonesia = No. 3 in world greenhouse gas emissions >>> reduce with nuclear power • Energy security: running out of oil >>> long-term uranium supply assured • Cost considerations: >>> nuclear power is at least comparable to fossil fuels like gas

  15. Indonesia’s problematic GHG emissions source = forestry, not energy Source: PEACE/World Bank, 2007

  16. Risk 1. Financial

  17. Economics of nuclear power (US$2007) Source: John M Deutch et al., Update of the 2003 Future of Nuclear Power, Massachusetts Institute of Technology, 2009

  18. Construction time of nuclear power plants worldwide Source: Stephen Thomas, Peter Bradford, Antony Froggatt and David Milborrow, The Economics of Nuclear Power: Research Report 2007, Greenpeace, 2007

  19. The Indonesian electricity crisis • Supply shortfall, but also…. • Structural issues • Low electricity tariffs don’t cover production costs • Restricted capacity for routine maintenance and upgrades • Rapid and serious deterioration of existing infrastructure • Structural reform required • Is nuclear power part of the solution? • An investment of this magnitude and degree of risk may potentially exacerbate the financial problems that underpin the current electricity crisis

  20. Risk 2. Regulation, safety and impunity • Regulation for security and safety • Indonesia has acceded to relevant IAEA protocols • Nuclear Energy Control Agency (Bapeten) central to implementation • Confidence undermined by 2007 convictions of two senior Bapeten officials and member of parliament • Doubts about accountability and administrative culture of impunity after Sidoardjo mud explosion. • Safety risks - the big question: • “if something happens at Muria, what are the consequences”

  21. Muria NPP explosion, Day 1 Source: John Taylor and Drew Whitehouse, An Analysis and Visualization of the Risk Associated with the Potential Failure of Indonesian Nuclear Reactors, ANU, 1998

  22. Muria NPP explosion, day 45 Source: John Taylor and Drew Whitehouse, An Analysis and Visualization of the Risk Associated with the Potential Failure of Indonesian Nuclear Reactors, ANU, 1998

  23. Muria NPP explosion, day 90 Source: John Taylor and Drew Whitehouse, An Analysis and Visualization of the Risk Associated with the Potential Failure of Indonesian Nuclear Reactors, ANU, 1998

  24. Muria NPP explosion, day 180 Source: John Taylor and Drew Whitehouse, An Analysis and Visualization of the Risk Associated with the Potential Failure of Indonesian Nuclear Reactors, ANU, 1998

  25. Muria NPP explosion, day 270 Source: John Taylor and Drew Whitehouse, An Analysis and Visualization of the Risk Associated with the Potential Failure of Indonesian Nuclear Reactors, ANU, 1998

  26. Muria NPP explosion, day 360 Source: John Taylor and Drew Whitehouse, An Analysis and Visualization of the Risk Associated with the Potential Failure of Indonesian Nuclear Reactors, ANU, 1998

  27. Risk 3. Seismic and tectonic risks • Close to Gunung Muria and to seismic fault lines • Information restricted, inadequate, and faulty • G. Muria: “a capable volcano” less than 25 km • Site within “screening distance” for pyroclastic material and flows, debris, mud, and new vents • Gases indicative of magma found 1.5 km from site • Site unstable due to permeable weathered upper layer of soil • Feasibility study reliance on Japanese standards for earthquake resistance undermined by Kashiwazaki-Kariwa NPP shutdown after 2007 earthquake • New offshore fault lines recently discovered, but data restricted

  28. Satellite image of Muria peninsula:McBirney et al (2003)

  29. Volcanoes within 150 km of Desa Balong: McBirney et al (2003)

  30. Central Indonesia - seismicity, 1964-2006

  31. Earthquakes in Java, since 1990

  32. Maars on the Muria Peninsula Source: Bronto and Mulyaningsih (2007)

  33. Politics - nuclear pushers • Nuclear agency BATAN • IAEA • Nuclear plant vendors: • KEPCO/Korean Hydro Nuclear Power • Mitsubishi Heavy Industry • Areva • Minister of Energy and Natural Resources Darwin Saleh • Ministry of Research and Technology • President Susilo Bambang Yudhoyono • PT Medco (Arifin Panigoro) • Nationalist streams in parties and military • United States - divided pro and con

  34. Politics - nuclear resisters • Locals: • villagers • Jepara and Central Java NGOs and parties • PT Djarum • Central Java NU: the fatwa haram • Jakarta-based NGOs • International NGOs and INGOs • Internal government: • Ministry of Environment - ? • Ministry of Finance - ?

  35. Balong village association representatives and Long March organizers: Sudharsono, Soemedi, Herman, September 2007

  36. Arabella Imhoff with Soemedi and map

  37. Entrance gate to Desa Balong, Jepara, Central Java, September 2007 Tolak nuklir: Oppose nuclear, destroyer of the umat, PLTN pembawa petaka: Nuclear power brings misfortune/accident PLTN pemusnah kehidupan: Nuclear power is the destroyer of life.

  38. NU members and Balong villagers demonstrating at the NU Jepara bahtsul masa’il, 1 September 2007

  39. Nuruddin Amin, chairman, Jepara regional Nahdlatul Ulama, and architect of the fatwa haram

  40. State of play: post-election revival = ? • Electricity crisis • powerful government promoters, as well as opponents • Presidential involvement (National Energy Council) • pressure from vendors • civil society campaign fatigue • finance central (VP Boediono; Finance Minister) • non-rational factors probably the key

  41. Australia and Indonesian proliferation risk: de-escalating threat perceptions and fantasies • Actual Indonesian proliferation risk low • But minority stream of Australian security specialists view likely Indonesian proliferation risks as reason to review Australian weapons options (including U. enrichment) • Indonesians remember Australian past nuclear programme; coupled with ADF force structure developments (esp. cruise missile planning) • Highest risk is negative cycle of misperceptions as basis for strategic planning • What do we need: a robust international code of conduct for nuclear consumer countries

  42. Nautilus sites and documents • Websites • Nautilus Institute: www.globalcollab.org/Nautilus • Indonesian nuclear power proposals http://www.globalcollab.org/Nautilus/australia/reframing/aust-ind-nuclear/ind-np/ • Australia - nuclear proliferation - historical and contemporary http://www.globalcollab.org/Nautilus/australia/reframing/aust-ind-nuclear/aust-prolif • Email: • rtanter@nautilus.org • Arabella.imhoff@rmit.edu.au

More Related