The Portola Campus demolition project is progressing with received bids, including a low bid of $2,148,000 from Evans Brothers. No DSA permit is required for the existing campus demo, with demolition expected to start in May 2012. The CCS received a DSA permit for relocating into portable buildings at Downer School, with construction bids anticipated by mid-May and completion projected for August 2012. The main building permit for Portola at Castro was received on February 28, 2012, and a Green Roof addendum is under review.
E N D
PROJECT STATUS • Existing Campus Demo • No DSA permit required • Project bids have been received. Apparent low bid = $2,148,000 (Evans Brothers) (total of 9 bids received) • Projected demolition start May, 2012 • CCS • DSA permit received for relocation into portable buildings at Downer School • Project to bid mid-May • Anticipate construction complete August, 2012 • Portola at Castro • Main building permit received on 2/28/12 • Green Roof addendum under review at DSA • OPSC Funding – Plan verification currently reviewing: • Seismic • Modernization (Portola) • Modernization (Castro)
PORTOLA DEMO “FIELD”
PORTOLA DEMO NAVELLIER STREET “SIDEWALK” “FIELD” TEMP CAMPUS
MID-LEVEL ENTRY AND ACADEMIC
UPPER LEVEL ARTS / MULTI-USE
LIBRARY INSET = MPR