An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RISK MANAGEMENT MAKING DECISIONS THAT COUNT NWHA 2014 ANNUAL CONFERENCE

  2. WATER DELIVERY AND MANAGEMENT SINCE 1910 YAKIMA-TIETON IRRIGATION DISTRICT RICK DIEKER - MANAGER

  3. YTID DIVERSION DAM AND HEADWORKS

  4. WHAT ARE THE RISKS? • ENDANGERED SPECIES ACT (ESA) IMPACTS TO YTID OPERATIONS • MAIN CANAL AND DIVERSION DAM UPGRADE OR REPLACEMENT

  5. THE RISKS FURTHER DEFINED • STEELHEAD • BULL TROUT • IMPACT TO EXISTING RIGHTS • OPERATIONAL CHANGES REGULATED OR NEGOTIATED? • AGE • UNSTABLE GEOLOGY • STORM EVENTS • CANAL FAILURE • LONG TERM OPERATION ESA LISTED SPECIES MAIN CANAL

  6. LOOK BACKWARD TO LOOK FORWARD • STARTING WITH 100 YEAR CELEBRATION OF WATER DELIVERY 1910 T0 2010 • WHAT DO WE HAVE ? • WHAT DO WE NEED ? • DEVELOP STRATEGY TO HELP SOLVE THE INDENTIFIED RISKS • SOME OF THE STRATEGY JUST HAPPENED AND SOME WAS PLANNED

  7. WHAT DO WE HAVE ?

  8. TIETON DAM AND RIMROCK RESERVOIR

  9. TIETON HYDROPOWER PROJECT

  10. YTID MAIN CANAL

  11. Rehabilitation and Betterment Project 1982-87 • Complete piping of Delivery system • 78 Million Dollars construction cost • 220 miles of new pipe • 2000 plus turnouts • New Reservoir at French Canyon • 6 pump stations • 2 in-line hydropower plants • 95% efficient delivery

  12. EXISTING DEBT SERVICE ($$) ENDS IN 2018

  13. Cowiche Creek Watershed Fish use and delisting discussion by David Child, DC Consulting LLC

  14. Steelhead Redds and Abundance Estimates

  15. WHAT DO WE NEED? • DEVELOP A STRATEGY TO HELP SOLVE THE IDENTIFIED RISKS • MAKE THE YTID MAIN CANAL AN INTEGRAL PART OF A FISH RECOVERY/RESTORATION PROJECT • COWICHE CREEK PROJECT • MAIN CANAL ALTERNATIVES ANALYSIS • $$$$$$$$$$$$$$ MONEY

  16. CCWUA PROJECT • YTID TO WHEEL WATER THROUGH OUR SYSTEM TO CCWUA (WATER DELIVERY AGREEMENT) • CCWUA POINT OF DIVERSION CHANGED FROM COWICHE CREEK TO TIETON RIVER • WATER NORMALLY DIVERTED FROM CREEK LEFT IN STREAM FOR FISH BENEFIT • BUILD PARTNERSHIPS FOR CURRENT AND FUTURE YTID PROJECTS

  17. Landowners and Irrigators • Bureau of Reclamation • Bonneville Power Administration • Washington Department of Fish and Wildlife • Washington Department of Ecology • North Yakima Conservation District • Yakima Tributary Access and Habitat Program • Yakima Tieton Irrigation District • Cowiche Creek Water Users Association • Washington River’s Conservancy (WA Trout Unlimited) • Yakama Nation • Cowiche Canyon Conservancy • Yakima County • City of Yakima • Yakima Basin Fish and Wildlife Recovery Board • NOAA Fisheries • South Central Washington Resource Conservation and Development Council WHO WAS INVOLVED?

  18. ALTERNATIVES STUDY • YTID MAIN CANAL REHABILITATION AND COWICHE CREEK WATER EXCHANGE • Conceptual design and evaluation of alternatives to increase the capacity of the main canal replacement or upgrade from 345 to 370 cfs. • Evaluate Design changes to YTID pipeline system and reservoir to deliver water to Cowiche Basin Users. • Preliminary Construction Costs for these options and determine the apparent best alternative.

  19. STUFF HAPPENS

  20. NEXT STEPS, OPTIONS AND PROJECTS • CONTINUE TO REFINE THE MAIN CANAL ALTERNATIVES DESIGN AND COSTS • CONTINUE TO DEVELOP COMPHREHENSIVE LOOK AT COWICHE CREEK SOUTH FORK AND MAIN STEM. • INCLUDE THE AHTANUM BASIN OPTION • INVOLVEMENT AND SUPPORT OF THE YAKIMA BASIN INTEGRATED PLAN

  21. THANK YOU