20 likes | 148 Vues
This summary presents the status report from 9 IEGs, including ATIS, CEG, ChEG, ETSI, and others regarding the 2nd 3GPP evaluation workshop. It indicates that a final evaluation report is expected from 8 IEGs, with ongoing simulations of 3GPP technology showing compliance with ITU requirements. Additionally, there were no issues concerning the evaluation methodology and parameters, and inquiries from ATIS to the ITU Forum were addressed. Key results discussed include peak spectral efficiency and various user efficiencies.
E N D
CJK-IMT25-025 The 2nd 3GPP evaluation workshop KITO, Eiji (e-kito@ab.jp.nec.com)
Summary • Status Reportfrom 9 IEGs • ATIS, CEG, ChEG, ETSI, TCOE, TR-45, TTA PG707, WEFG, WINNER+ • Final Evaluation Report will be expected from 8 IEGs • ATIS, CEG, ChEG, ETSI, TCOE, TR-45, TTA PG707, WINNER+ • No issues on the evaluation methodology and parameters • Simulation of 3GPP technology are on going by Some IEGs • All available results show 3GPP Technology meets the ITU requirements • The question from ATIS on ITU Forum was answered orally and the answer will be input to ITU Forum. • The following result were discussed and there was no critical issue. • Peak spectral efficiency, Cell spectral efficiency, Cell edge user spectral efficiency