This document summarizes the collection of data from various test beam periods spanning from June to October 2012. Notable periods include June's performance analysis of MM in a magnetic field, July's assessment of uTPC and VMM1, September's evaluation of uTPC, VMM1, and a large chamber L1, and October's examination of uTPC, VMM1, and the triggering scheme in L1. A systematic analysis of this data is essential for presentations at the Vienna conference in February 2013, the January review meeting, and the TDR in May 2013.
Comprehensive Data Analysis and Planning for Upcoming Conferences and Reviews
E N D
Presentation Transcript
We’ve/’ll collected data from different testbeam periods • June’12 (Performace of MM in a B magnetic field) • July’12 (uTPC, VMM1) • Sept’12 (uTPC, VMM1, large chamber L1) • Oct’12 (uTPC, VMM1, Trigger scheme, L1) • Need to analyze the data in a systematic way for: • Vienna conference, Feb 2013 • January Review meeting • TDR, May 2013