yves
Uploaded by
14 SLIDES
326 VUES
140LIKES

PSM 1 Seminar

DESCRIPTION

PSM 1 Seminar. [ nama ]. Content. Introduction Problem Background Research Question Objective Scope of the study Literature Review Research Methodology Gantt Chart Current Progress and Expected Result Conclusion References. Introduction.

1 / 14

Télécharger la présentation

PSM 1 Seminar

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PSM 1 Seminar [nama]

  2. Content • Introduction • Problem Background • Research Question • Objective • Scope of the study • Literature Review • Research Methodology • Gantt Chart • Current Progress and Expected Result • Conclusion • References

  3. Introduction • Disini, kamuletakkanbeberapaisipengenalanapa yang kamunakbuat. Secararingkassahajadalam 3,4 point. Please jangan copy paste, just tuliswhats in your mind ok about what you are going to do and not to do.

  4. Problem Background • Disini, kamuletakkanmasalah-masalah yang berlakudengansistem robot ataupun • Apajugaberkaitan previous system, apa yang sistemsebeluminibuat yang menyebabkankamubuat lain dari yang lain

  5. Research Question • Ok, letakkanpersoalanapa yang kamuhendakcubacapai. • Contoh: What is the most suitable sensor can be used for tour robot?

  6. Research Objective • Put your objective(s) here. At least two.

  7. Scope of the study • What you do • And what you do not do

  8. Literature Review • Here, Literature review section will divide into several sections. Akan adabeberapa slide tambahan lain kamuakanletakkan. Maksudsayaselepas slide Literature Review ini, slide apa. Contohnya • Slide 1: Pengenalankepada Android : 1 slide • Slide 2 : telefonpintardancapabilitynya • Slide 3 : Jenis-jenis OS • Slide 4 : Apa yang bolehbuatdanapa yang future bolehbuat

  9. Research methodology • Copy paste research methodology kamudan explain secara by words kepada examiner.

  10. Gantt Chart • Copy apstedan explain la skit kot

  11. Current Progress • Kamuletakkan screen shot apa yang kamubuat. Letak banyak2 bagidiaimpressSSsss. Gambargambar, gambar. Ada video lagibagus. Yang penting, kenatarikperhatiandia.pinjamsapa-sapapunyakameradanrakam video apakamubuat.

  12. Expected Result • Letakkanjangkaanhasilkamu

  13. Conclusion

  14. References

More Related
SlideServe
Audio
Live Player
Audio Wave
Play slide audio to activate visualizer