1 / 4

MicroMegas for the Small Wheel Region (MSW) Project

MicroMegas for the Small Wheel Region (MSW) Project. Plans and Decisions needed. Plan to installa MicroMegas prototype „MSW chamber“ in ATLAS for run-2 Location either sector 9 or sector 13 Side A or side C Covers half of a CSC Large sector chamber (outer radius) 4 active layers Status:

yvette-hyde
Télécharger la présentation

MicroMegas for the Small Wheel Region (MSW) Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MicroMegas for the Small Wheel Region (MSW) Project S. Zimmermann, MSW Plans

  2. Plans and Decisions needed • Plan to installa MicroMegas prototype „MSW chamber“ in ATLAS for run-2 • Location either sector 9 or sector 13 • Side A or side C • Covers half of a CSC Large sector chamber (outer radius) • 4 active layers • Status: • Chamber construction in progress at CERN, will be completed within the next few weeks • Frontend electronics is on the critical path .... Plan to equip with VMM-2 frontend chip. Submitted for production end January, packaging and pin-out design currently under development • Backup plans: Use APV frontend electronics • Decisions to be taken: • Side A or side C, prefer as late as possible installation date • Exact location to prepare services • Service installation S. Zimmermann, MSW Plans

  3. Options MM quadruplet ? MM quadruplet S. Zimmermann, MSW Plans

  4. Services • OC box at the edge of the SW area, Cu-to-fiber converters • HDMI cables from frontend cards to OC box • OC box receives LV (4.5 ... 15V) and distributes power to frontend cards • Plan to use spare channels of CSC Wiener LV power supplies in rack Y5823X0 or Y2924X1  Cables needed to detector • HV supplies from additional CAEN mainframe in USA15, rack Y2716A1 (9 channels = cables) • Gas: to be defined, local gas system used in 2011/12 together with sMDT no longer available • Readout: VME crate + PC + ATCA crate in rack Y2616A1, 2 optical fibers to UX, optical fiber to ROS PC (TDAQ) • Integration into ATLAS TDAQ/ATLAS partition, plan is to be part of standard ATLAS data taking – preparations ongoing, incl. Stopless removal etc. • Integration to be scheduled for one of the late M-Weeks ... S. Zimmermann, MSW Plans

More Related