1 / 14

Corridor Management Rijkswaterstaat Vessel Traffic Management Center Anja Hannema

Corridor Management Rijkswaterstaat Vessel Traffic Management Center Anja Hannema. Contents. Introduction to Corridor Management Appointments Strassbourg 20th March 2008. Introduction to a corridor approach:. What are corridors ? Why to approach inland shipping corridor based ?

Télécharger la présentation

Corridor Management Rijkswaterstaat Vessel Traffic Management Center Anja Hannema

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Corridor ManagementRijkswaterstaatVessel Traffic Management CenterAnja Hannema

  2. Contents • Introduction to Corridor Management • Appointments Strassbourg 20th March 2008

  3. Introduction to a corridor approach: • What are corridors ? • Why to approach inland shipping corridor based ? • What are the expected benefits ? • Under what conditions can a corridor approach work ? • What are the goals to aim for ? • How to proceed ?

  4. Introduction to a corridor approach,Corridors? • What are corridors ? • Based on statistical analysis fairways that: carry MAJOR cargo flows • Many similarities in “customers demands” • Good example: Paris – Antwerp – Rotterdam • Main corridors in the EU…. • Netherlands has identified 8 corridors…

  5. Introduction to a corridor approach,Corridors, examples Source VNF

  6. Source INE Source VNF

  7. Eight corridors inthe Netherlands Established on statistics: major cargo flows

  8. Introduction to a corridor approach Why to approach inland shipping corridor wise ? • Industries want predictable and guaranteed transport times • Harbours want efficient use of their facilities • Shippers want reliable and economical transports • Skippers want smooth and profitable transports

  9. Introduction to a corridor approach,Expected benefits What are the expected benefits ? • Better service to fairway users to provide: • Guarantees on transport times for “just in time” supply chains • (Time) efficient harbour stays • Optimal lock / bridge passages • Efficient transports (preserve fuel etc.) • Optimal use of fairways

  10. Introduction to a corridor approach,Conditions What are the conditions for Corridor Management ? • Agreements with stakeholders • Cooperation between many parties (public and private) • Investments in organization, technology, training etc. • Information exchanges between stakeholders and fairway management

  11. Introduction to a corridor approach,Goals • Involvement of (sea-)harbors, shippers and skippers • Practical approach (no repetition of previous studies) • Limited time frame • Implementation of quick wins • Working towards realistic, implemental end-results

  12. Introduction to a corridor approach,How to proceed • Organizational steps • Initial investigation between countries/organizations • Study (TEN-T funding ?) • Identifying “quick wins” and parallel implementation • Evaluation of study results • Implementation

  13. Appointments Strassbourg 20th March 2008 • Fairway Organizations within FR, B, CH, D, NL and A agree that Corridor Management approach is a good concept on an operational level. • Further investigation necessary: which items,. Quick wins, integration in PLATINA or other studies. • Examples of items for short term: coordination maintenance works, coordination of information on blockings • Examples of items for longer term: implementation of ”just in time” principle, joint calamity abatement, comparable training activities of lock and bridges personnel. • July 2008: draft project plan will be discussed. Rijkswaterstaat Corporate Dienst13

  14. End of Presentation

More Related