An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. E906 Closeout 12/11/06

  2. Science • Experiment needs to be done • ubar/dbar at high x essential for understanding the basic science of the nucleon • Also important input for the interpretation of proton colliders and RHIC experiments. • (note: CTEQ considers putting more weight on E866 than nuFe data)

  3. Collaboration • Strong collaboration with experience in this area. • All major areas appear to be covered.

  4. Design • Experiment design based on successful previous apparatus. • No major technical risk in new equipment which is all based on well understood technology. • Significant concern about status of old equipment planned for reuse. • Recommendation – move quickly to evaluate the status of all recycled equipment to ensure the availability of adequate working channels with spares. • Need to study FERA->VME interface to evaluate the usefulness of the old electronics.

  5. Cost is a problem • We believe the base cost on new equipment (magnet, station 1, hodoscopes) is reasonable. (Formal contigency is low, but cost estimates appear to contain contingency. Need to handle this divide consistently.) • Recommendation: We would like to see more detail on the budgets/contingency for our report.) • But the status of the existing equipment has not been carefully evaluated and the costs and contingency on that part of the proposal are too small. • Recommendation: Quickly evaluate the status of the equipment to provide a more justifiable contingency.

  6. Fermilab • Fermilab has evaluated the cost of providing substantial support including space, beam, assembly, safety. • a MOU between Fermilab and the collaboration needs to be negotiated before Stage2 Fermilab approval.

  7. Beam • Beam spill characteristics are very important for the data rates and efficiencies. • The beam parameters need to be specified. • Studies of the beam structure and performance of the proposed beamline should be done as quickly as possible as inputs into the final trigger/readout design and run plan.

  8. Need a real management plan • Identified L2 managers for all subsystems including liason to Fermilab. • Reporting system with quarterly reports • Who owns the contingency – need a fixed procedure for dealing with it. • MOU’s with institutions

  9. Conclusions • Need clearer management plan • Need quick evaluation of status of the recyclable components • Need more detail/consistency in cost/contingency estimates • Need to do this physics!

  10. Notes from the closeout • We finalize in mid January • We would like the management plan by then. • We need FTE estimates (hrs and source of funding) and more purchasing details on the station 1 and hodoscope projects which are definitely part of the big project.