50 likes | 163 Vues
The LBT Q1 2007 Engineering Review highlights notable progress and ongoing challenges related to primary mirror cells. Key achievements include successful performance with no oscillations and a significant increase in air compressor capacity. However, issues such as deficient documentation, inadequate hardpoint stiffness, and the need for improved cooling measures remain. Plans for the upcoming quarter involve staff replacements, actuator upgrades, and enhancements to cell documentation. The review emphasizes the need for careful monitoring and maintenance to ensure continued operational success.
E N D
LBT Q1 2007 Engineering Review Primary Mirror Cells
Highlights (Q1/2007) • Cells behaving well, no oscillations this winter • SOML Integration contract closed • Walkthrough conducted in January, 100 item punch list generated, ~50% completed • Air compressor capacity increased 75% in January • LBTO staff replaced SX HP-4 2 weeks ago • SX characterized last September • DX partially characterized LBT Q1 2007 Engineering Review
Open Issues • Technical • Cell Documentation deficient and/or nonexistant • Hardpoints have lower stiffness that desired, meet 80N/m (min required) • Air boxes hot, require insulation/cooling • Actuator test stand undocumented/not maintainable • Dew-point of cell compressed air not being monitored • Schedule • None • Financial • Cell documentation and test stand upgrade will be cost-plus, >$100k • Dew-point monitors ($7 >10k) will be charged to? • Resource • Mountain staff limitations pace work at Observatory • J Hill will compute new force distribution matrix this Summer (elimination of HP actuators) LBT Q1 2007 Engineering Review
Progress (Q1/2007) • Cell walk through completed • punch list fixes in progress • LBTO staff replaced SX HP-4 • Compressors upgraded from 30 to 50hp, air supply is now adequate to operate both cells on single compressor LBT Q1 2007 Engineering Review
Planning (Q2/2007) • LBTO staff will replace first dual actuator 2nd qtr • LBTO staff will diagnose, repair and recalibrate actuator 2nd qtr • SOML will replace puck bonds SX HP-0 and 1 May 17-18 • ETS has offered project proposal to prepare cell documentation (acceptance TBD) • ETS to modify hardpoint monitor board (TBD) • High pressure actuators will be converted to standard pressure, 3rd qtr • ETS will rework Actuator Calibration Stand (TBD) • Engineering will complete DX characterization measurements 2nd qtr LBT Q1 2007 Engineering Review