Project : Proposed Equestrian Campsite

Project : Proposed Equestrian Campsite. Grandfathered SRP holder has requested development and installation of a 15 unit campsite to accommodate equestrian users SRP holder has political connections & NCA managers have identified a need for equestrian facilities. .

zuwena
Télécharger la présentation

Project : Proposed Equestrian Campsite

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project : Proposed Equestrian Campsite • Grandfathered SRP holder has requested development and installation of a 15 unit campsite to accommodate equestrian users • SRP holder has political connections & NCA managers have identified a need for equestrian facilities.

  2. View of Proposed Project from KOP

  3. Proposed Location – pros(Within the Red Rocks NCA & Class II VRM) • Existing area of disturbance with existing trail system. • Provides an equestrian facility within the NCA • Provides opportunity increased revenue to the local economy

  4. Proposed Location- cons • Visible from major scenic overlook/vista (KOP) • May not meet VRM Class II objectives • No natural features -topographic or vegetative to use for screening • Large vehicles/ trailers= bold disconnect • Landform and line may be affected

  5. Proposed Location without Mitigation

  6. Proposed Location- Mitigation • Curve access road alignment to follow the natural land form & lines • Natural color on road surface and any new facilities • Curvilinear alignment on campsite road and individual campsite locations • Re-contour the project area to provide visual variety in form & line in an attempt to blend with natural surroundings • Orient campsites so that parked vehicles/ trailers have minimal surface area facing the state scenic byway • Disturbed vegetation would be saved and transplanted around new campsite • New facilities would be minimal in size and constructed of native materials and/or painted with appropriate colors • Location of structures would be placed in an irregular fashion so as to emulate the natural landscape • Installation of informational kiosk at parking area – map of trail system

  7. Proposed Location with Mitigation

  8. Our Proposed Alternative Location • Located northeast of the existing access road, behind existing coral and bluff • May not be as visible from major scenic overlook/vista (KOP) • May meet VRM Class II objectives • topographic & vegetative natural features - screening • Large vehicles/ trailers= less visible from scenic byway and KOP • Less disruption to landform and line • Larger project area, more vegetation, more diversity • Would satisfy proposal submitted by SRP holder • Increased distance from KOP= less likely to attract the visitors attention

  9. Well-Designed Alternative Location

  10. Conclusion • We recommend the alternative location for development & installation of an equestrian campground facility • Utilization of native materials and appropriate colors would greatly improve potential visual contrast between the campground and surroundings • If the proposed location is selected by NCA managers we recommend the SRP holder provide the financing for the following: • - contract assistance towards completion of surveys - Section 7 consultation -RMP plan amendment