Chapter 5 Cost Estimating and Bidding

Chapter 5 Cost Estimating and Bidding. BCN 4708 Fall 2008. Estimating and Bidding. Estimating process Determine labor, material and equipment needs How much subcontracting? Assign prices to quantities Add in: indirect costs, overhead and profit ASPE AACE. Estimating and Bidding.

kert
Télécharger la présentation

Chapter 5 Cost Estimating and Bidding

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Chapter 5 Cost Estimating and Bidding BCN 4708 Fall 2008

  2. Estimating and Bidding • Estimating process • Determine labor, material and equipment needs • How much subcontracting? • Assign prices to quantities • Add in: indirect costs, overhead and profit • ASPE • AACE

  3. Estimating and Bidding • Lump-sum Estimates • Unit-price Estimates • Approximate Estimates p.79 • Cost-per Function • Area Cost Estimate • Volumetric Cost Estimate • Modular Takeoff Estimate • Partial Takeoff Estimate • Panel Unit Cost Estimate • Parameter Cost Estimate

  4. Estimating and Bidding • Bidding Procedures • Private • Public • Advertisement for Bids • Private • Public • Reporting services

  5. Estimating and Bidding • Decision to Bid • Set-Asides • Qualification • Deposits • Availability of Plans and Specs • Bidding Period • Instruction to Bidders • Preliminary conditions • Jobsite Visit • Bid invitations

  6. Estimating and Bidding • Quantity Surveys / Takeoffs • Architect / engineer • Contractor • Professional Quantity Surveyors • Cost Summaries fig 5.4 / 5.5 • Material costs • Direct labor cost • Indirect labor costs

  7. Estimating and Bidding • Equipment Costs • Equipment Expense • Equipment Rates • Ownership and Operating Costs • A = C(n+1) + S(n-1) / 2n • Equipment production rates

  8. Estimating and Bidding • Subcontractor bids • Bid Depositories • Allowances • Overhead • General Overhead • Project Time Schedule • Markup 5 – 20

  9. Estimating and Bidding • Lump-sum Recap Sheet • Bid Changes • Change sheet • Unit price recap sheet • Factor • Contract Bond • Surety • Performance or payment bond • Addenda

  10. Estimating and Bidding • Scope Bidding • Computer-Based Estimating • Range estimating