1 / 5

MODAPS PIP Report

MODAPS PIP Report. March 17, 2009. 1-877-711-1856 759461. Summary of MODAPS Production 3/17. Collection 5 Forward Processing Terra is as close to real time as possible, Aqua is 5 days behind.

nani
Télécharger la présentation

MODAPS PIP Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MODAPS PIP Report March 17, 2009 1-877-711-1856 759461

  2. Summary of MODAPS Production 3/17 • Collection 5 Forward Processing • Terra is as close to real time as possible, Aqua is 5 days behind. • Aqua days 2009/69 and 71 were delayed due to the problem with the Alaska line and maneuvers. Both days have been closed at less than 100% with 25-minutes of data outage. • LST C4.1 for Terra and Aqua is running in parallel with C5 until collection 6 starts in 2010. • Aqua Atmospheres is running as collection 5.1 on forward processing. This has been delayed due to same issues with days 69 and 70. • The new land cover PGE has been installed into operations. Products have been generated and will be exported to the LPDAAC when insert testing completes for the new ESDTs. A bug was discovered in the input data provided for this processing. The data will be reprocessed once a new set of input data is received.

  3. Reprocessing (3/17) • Collection 5 Land Reprocessing • We are processing 4 additional tiles of BRDF in the Arctic region from the start of mission. Years 2000-2004 have completed. • The leading edge is 2005/049. • Collection 051 Aqua atmospheres Reprocessing • The leading edge is 2006/258 (June 20) • The current x-rate is 14.8x • The average x-rate since the start of reprocessing is 14.1x • Collection 041 Land LST Aqua and Terra Reprocessing • Reprocessing began at data day 2007/001 and will run through December 2008 • The leading edge is 2008/099 • The current x-rate is 3.4x

  4. Summary of PGE Deliveries to SDST (3/17) • Level 1: • A Terra and Aqua L1B for collection 6 has been baselined. • We have received the C6 LUTs from MCST • Work has continued on the Collection 6 PGE01 and the initial delivery has been delayed until late April. • Atmospheres: • All atmospheres PGEs, except PGE69, have been converted to Linux. • New versions of Terra PGEs for C051 are expected in late April. • Land: • A new version of PGE13 was baselined to correct a bug found in the L2g-lite science test. • The new version of PGE72 for science testing the new water mask has been baselined. • We have received the new version of PGE80 for the collection 5.1 BurnScar processing. • We have received the new PGE87 land cover code. Request for new ESDTs has been sent to ECS and received by the LPDAAC. • We have received the collection 6 versions of PGE16 (LST), PGE75 (daily CMG), PGE21 (8-day Surface Reflectance), PGE90 (Aeronet Subsetter) and PGE11(LSR) • A problem with the meta data in the Linux version of PGE 28 needs to be corrected. A new Linux version is expected this week.

  5. Summary of Science Testing 3/17 • Atmospheres: • An IRIX/Linux comparison test completed for PGE 55 and we are waiting for a PCR. • A one month reference test (April 2005) using de-registered L1B data has completed and is under review. • A one-month science test for PGE 83 C051 for April 2005 has completed and is under review. • Land Science Testing: • A 16-day, 10 tile test for L2g-lites completed and is under review. A small bug in the PGE13 metadata was detected and the test will be reprocessed. • L1 Science Testing: • Four 1-day tests for the Collection 6 L1B (Terra and Aqua) have been completed • An additional 1-day golden tile test has completed and is under review • Mandriva 2008 Science Testing: • PGEs 01, 02 and 03 have passed Mandriva testing. • Land PGEs are being tested using inputs generated on the mandrake system: • PGEs 7, 8, 11, 22, 44, 43, 46, 75, 80 and 84 have passed Mandriva testing • The atmospheres PGEs that have recently been converted to Linux have not been tested on Mandriva.

More Related