An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Oak RidgeNationalLaboratoryStatus Report Presented By: Greg Larson Oak Ridge National Laboratory (ORNL) UT-Battelle Analytical Services Program ASP 2010 Workshop September 20-24, 2010 Seattle, WA

  2. Oak Ridge Reservation (ORR) • There are 3 major operating sites: • Y-12 National Security Complex • Defense Program • East Tennessee Technology Park (ETTP) • D&D to privatize • Oak Ridge National Laboratory (ORNL) • DOE’s largest and most diversified multi-program national laboratory • Science and Technology • Energy Resources • Environmental Quality • National Security

  3. Environmental Protection and Waste Services Division (EPWSD) • Environmental Protection Services • Environmental Compliance (Guidance to UT-B) • Water Quality (NPDES) • Air Quality (CAA, NESHAP) • Solid and Hazardous Waste (RCRA, TSCA) • Environmental Sampling/Data Evaluation • NEPA Compliance • Laboratory Waste Services • Hazardous and Mixed Waste Management • Radioactive Waste Management • Waste Handling and Waste Facility Operations • Pollution Prevention • Hazardous Material Spill Response • Environmental Management Programs (Legacy) • Legacy Material Disposition Initiative (LMDI) • Interfacing with DOE ORO EM contractor Bechtel Jacobs Company (BJC) • Short- and Long-term Stewardship • ORNL Integrated Facilities Disposition Project (IFDP) • Operations and Quality Support • Analytical Services Program • Waste Certification Program QA • Performance Planning and Assessment

  4. UT-B ORNLAnalytical Services Program (ASP) Update FY10 Topics: • Weekly Sample Status Meetings; ASC, Samplers, Safety, Transportation, etc. • Review Sampling/Analytical Data Issues • Sample Project Walkdown/Work Planning • Lab Selection/Justification • Onsite Transportation/Shipment Offsite • Incoming Data; Completeness Reviews (Did we get what we asked for?) • Performance Metrics Developed

  5. UT-B ORNLAnalytical Services Program (ASP) Update (cont’d) • Increased Lab Communication/Interface • Consolidate sample volume/mass based upon requested analyte suite • Unknowns • Partial PK; Tentative Proper Shipping Name • No PK; unknown rad; 2 phase sampling; onsite gross alpha/gross beta, and/or gamma spec; support sample activity calcs

  6. Contracting Analytical Support • Basic Ordering Agreement (BOA) with several contract full service laboratories • Almost all analytical support is provided by BOA laboratories; limited onsite usage • Initial contract award in FY07 with 4 option years (waste) • FY11; exercised 4th option year • Laboratory selection performed and documented on each sample request (lab justification); depend on analytical suite. • Lab Justification Factors considered: • Cost (# samples, analyses, TAT, deliverable requested) • Past performance (PT results, DOECAP audit results; Audit findings, QA/QC issues to questions, and invoicing; technical expertise; QA/QC; NRC license; etc.) • Other issues (sample volume required, NRC license, facility safety basis, reporting issues, timeliness of response)

  7. Special Analytical Needs • High level Rad samples • No-Rad Added (NRA) Determination • Total PCBs and individual Aroclors; RL < 2 ppm • Isotopes covering range of the Nuclide Chart • NESHAP requires low minimum detection limits • Contract modifications to accommodate • Unusual matrices (HEPA filters, paint chips, etc.)

  8. Offsite LabsPros And Cons Pros • Flexible • Willing to tackle difficult matrices • Competitive prices • Turn Around Time • Deliverable documentation package Cons • On rare occasions; limited by NRC license • DOT shipment offsite • Limited instances; corrective actions on report anomalies; result in limiting usage until corrected

  9. Future Analytical Needs • Monitoring and surveillance activities to remain steady over the next few years • Spallation Neutron Source (SNS) • Demolition activities (Central Campus) • ARRA (3026; 2000 Complex) • Glovebox cleanout project • Campus Revitalization • New Construction Site Characterization

  10. UT-B ORNLWaste Management Update FY10 Topics: • Waste Generation & Disposition Year-To-Date • Modernization of Laboratory Facilities (MLF) Project; New Facility Construction • MLF move preparation; cleanout excess chemicals from Bldg. 4500N • Legacy Materials Disposition Initiative (LMDI) • ARRA Funding; Accelerated Cleanup associated with Integrated Facilities Disposition Project (IFDP) • Bldg. 3026; 2000 Complex D&D; 9204-3 Glovebox Cleanout • Full Chargeback to Generator to include disposal costs • Driving increased waste disposal during FY10

  11. Modernization of Laboratory Facilities (MLF) Project Architectural Drawings

  12. Bldg. 3026; Demolition Before After

  13. Waste Generation and Disposition; FY10 YTD HAZ / MIX / LLW / TRU Waste Generated • FY10 waste generation estimated to be approximately 2,047 m3 (~775; B-25 box equivalents), over 410% higher than last year. • 80 shipments of waste (1,491 containers) to 15 different vendor waste facilities successfully performed. • No non-compliances, violations, or injuries • Effective & efficient management of waste inventory through timely waste shipments, minimizing waste in storage • Successful chemical deactivation of potential shock sensitive waste. • Successfully began 4500 cleanout project (MLF preparation), dispositioning over 1,930 excess items & 30,000 excess samples • Effective preparation for implementation of a new waste chargeback model beginning October 1, 2010 FY10 Laboratory Waste Generation Was Unusually High

  14. Oak Ridge National LaboratoryWaste Generation (Includes ARRA Waste)* Hazardous Waste Mixed Waste Low Level Waste TRU Waste FY10 Forecast includes 5.4 m³ of CH and 25.6 m³ of RH * Includes waste from ARRA Funded Projects. Data Date: 08/31/2010

  15. ORNL DOECAPTSDF and Laboratory Auditors • 3 DOECAP TSDF auditors qualified in following disciplines: • 1 Waste Operations • 3 Radiological Control • 2 Transportation Management • 2 DOECAP Laboratory auditor qualified in following disciplines: • 1 Hazardous & Radioactive Material Management • 1 QA Management Systems • 1 Organic Analyses • 1 Inorganic and Wet Chem Analyses • FY10 Audit Participation: • 4 TSDF Audits supporting following disciplines: • 1 – Waste Operations • 2 – Radiological Control and • 2 – Transportation Management • 1 Lab Audit as AIT

  16. Future of ORNL with DOECAP • ORNL is committed to: • Continue using DOECAP and Mixed Analyte Performance Evaluation Program (MAPEP) resources; and • Continue supporting DOECAP on TSDF and Lab Audits