10 likes | 128 Vues
The main objectives for the 2002 upgrade include completing the S.C. Phase II, selecting and operating IP appliances, infrastructure logistics, expanding network extensions, software support, and engineering products evaluation. The focus is on upgrading the Accelerator Network infrastructure, experimental areas, and pits, with an emphasis on network design and completion. Interactions with IT services, database consistencies, network analysis, and software operations are vital components addressed in this upgrade.
E N D
Main Objectives for 2002 Upgrade of the Accelerator Network & LHC network design Completion of S.C. phase II Selection, Configuration and Operation of IP appliances LHC computing prototypes CN jmj Infrastructure CM,ES,JS,MD CG Passive/Active infrastructure logistics and CFT, S.C. phase II, Accelerator Network Infra Upgrade, Experimental Areas & Pits, Network extensions Software support & Engineering DF,MZ,NG IB Products evaluation and integration, DNS, DHCP, CFMGR (device configuration) Accelerator active infrastructure logistics & CFT 513C & LHC computing JAB,MC,<pparc> Computer center and backbone network design, Product Validation, Data Challenges, OpenLab Interactions with IT services Remedy Workflow NSO Ovdv ST-EL-FO, SL-CO, TCR relations Network Consultation office AR,IG AF,JLV First Line support, contract follow up, database consistencies, Network analysis Software for Operation EV,<new>,<fellow(s?)> MF LANDB, MTP, WEBREQ, SPECTRUM Remedy support IT/CS Campus Network Structure by Team for 2002