An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. August 19, 2013 All Experimenters’Meeting

  2. Machine Status • Proton Source Commissioning and Studies • 8/13-8/14: Linac & Booster Maintenance Period • Main Injector • MI30 vacuum • Work continues to resolve the high gas load at MI308 • MI back-fed from Master Sub-Station • KRS T85 work complete, but still using Feeder 45 for MI conventional • Need to schedule a 20 minute MI conventional power outage to remove the back-feed from Master Sub-Station after tunnel work. • SY120 • Neutrino Muon • G2 NM1 berm pipe progressing • Mtest • MC6 magnet replacement

  3. MI 307 to 309 Section 1 Section 2 Section 3

  4. Section 3 • Stable • Holding vacuum • No further work

  5. Section 2 • Contamination • Bellows • Pirani Gauge • Samples sent for testing • Section 2 removed • Cleaning elements and building a new section in parallel • Leak check and reinstall

  6. Section 1 • RGA Scan completed Friday • Did not reveal anything conclusive • Additional baseline scans this morning • Downstream end put under vacuum (not including collimator) • Heated bellows for 30 seconds • Ion pump tripped off. • Section 1 contaminated • Collimator beam pipe will be cleaned in place • Remainder of section replaced.

  7. Neutrino Muon • G2 NM1 Berm Pipe Progress • Status – Welding third set of pipes in enclosure M. Geelhoed 8/16/2013

  8. August 2013 DRAFT

  9. Shutdown 2012 Schedules and Links: Schedule can be accessed from the Operations Home Page - Schedules -> Operations Schedule Direct link to schedule - http://www-ad.fnal.gov/ops/schedule.html