100 likes | 191 Vues
Objective AOP04.2. Objective AOP04.2. Comprehensive Explanation Link to European ATM Master Plan Most important SLoA (s) Supporting Material ESSIP Report 2013 Objective Coordinator’s Analysis, recommendations, tips & tricks Conclusions Links and contacts. Comprehensive Explanation.
E N D
Objective AOP04.2 • Comprehensive Explanation • Link to European ATM Master Plan • Most important SLoA(s) • Supporting Material • ESSIP Report 2013 • Objective Coordinator’s Analysis, recommendations, tips & tricks • Conclusions • Links and contacts September 2014
Comprehensive Explanation Implement Advanced Surface Guidance and Control System (A-SMGCS) Level 2 • This objective aims at implementing A-SMGCS Level 2 which consists of an airport surface surveillance system (i.e. A-SMGCS Level 1) complemented by an A-SMGCS control tool to detect potential conflicts on runways and intrusions into restricted areas and provide the controllers with appropriate alerts; • The applicability area is presented in Table 8 of Part IV Annex B of the ESSIP 2012 document; • Initial operational capability - 01/2007, Full operational capability - 12/2017 September 2014
Link to European ATM Master Plan • [AO-0102]-Automated Alerting of Controller in Case of Runway Incursion or Intrusion into Restricted Areas • Enablers covered: • AERODROME-ATC-03 • CTE-S5 • CTE-S9b • PRO-139 • PRO-201 September 2014
Most important SLoA(s) • ASP01 - Install required A-SMGCS control function equipment; • ASP02 - Train aerodrome control staff in the use of A-SMGCS Level 2 in the provision of an aerodrome control service; • ASP03 - Implement approved A-SMGCS Level 2 operational procedures at airports equipped with A-SMGCS Level 2. • APO01 – Install required A-SMGCS control function equipment September 2014
Supporting Material • EUROCONTROL-Advanced Surface Movement, Guidance and Control Systems (A-SMGCS) Implementation Manual, Edition 1.0, dated 15.04.2011. Url:http://www.eurocontrol.int/articles/a-smgcs • EUROCONTROL-Functional Requirements for A-SMGCS Implementation Level 2, Edition 2.1, dated 01.06.2010. Url: http://www.eurocontrol.int/articles/a-smgcs • ETSI-EN 303 213-2, Ver. 1.1.1 - Advanced Surface Movement Guidance and Control System (A-SMGCS); Part 2: Community Specification for A-SMGCS Level 2 including external interfaces, dated October 2010, OJ 2010/C330/2; • ETSI-EN 303 213-3, Ver. 1.1.1 - Advanced Surface Movement Guidance and Control System (A-SMGCS); Part 3: Community Specification for a deployed cooperative sensor including its interfaces, dated October 2010, OJ 2010/C330/2; • ETSI-EN 303 213-4-1, Ver. 1.1.1 - Advanced Surface Movement Guidance and Control System (A-SMGCS); Part 4: Community Specification for a deployed non-cooperative sensor including its interfaces, Sub-part 1: Generic requirements for non-cooperative sensor, dated October 2010, OJ 2010/C330/2; • ETSI- EN 303 213-4-2, Ver. 1.1.1 - Advanced Surface Movement Guidance and Control System (A-SMGCS); Part 4: Community Specification for a deployed non-cooperative sensor including its interfaces; Sub-part 2: Specific requirements for a deployed Surface Movement Radar sensor, dated October 2010, OJ 2010/C330/2, Url : http://webapp.etsi.org/WorkProgram/SimpleSearch/QueryForm.asp September 2014
Supporting Material • ICAO-Doc 9830-Advanced Surface Movement Guidance and Control Systems (A-SMGCS) Manual, First Edition, dated 01/07/2004. Url: http://icao.int/publications/Pages/catalogue.aspx • EUROCAE-ED-116-Minimum Operational Performance Specification for Surface Movement Radar Sensor Systems for use in A-SMGCS, dated January 2004; • EUROCAE-ED-117-Minimum Operational Performance Specification MOPS for Mode S Multilateration Systems for Use in Advanced Surface Movement Guidance and Control Systems (A-SMGCS), dated November 03; • EUROCAE-ED-87B-Minimum Aviation System Performance Specification for Advanced Surface Movement Guidance and Control Systems (A-SMGCS) - Levels 1 & 2 - Including Amendment N 1, dated January 2009. Url: http://boutique.eurocae.net/catalog/index.php September 2014
ESSIP Report 2013 September 2014
Objective Coordinator’s Analysis, recommendations, tips & tricks • More elaborate explanation of chosen progress assessment is required. • This objective should not be declared completed if AOP04.1 is not declared completed. September 2014
Links and contacts • Objective Coordinator: PredragVranjkovic, +32 2 729 3257 • predrag.vranjkovic@eurocontrol.int • DNM Objective Expert: Paul Adamson, +32 2 729 5183 • paul.adamson@eurocontrol.int September 2014