NEW YORK STATE. DEPARTMENT OF TRANSPORTATION. Superstructure Replacement of Route 31 over Canandaigua Outlet with Deck Bulb Tees (DBT) Mathew Royce PE. OFFICE OF STRUCTURES. WHY DBT?. PROJECT INTRODUCTION. Design and Construction Issues. UHPC Joint. DUCTAL UHPC CUBE BREAKS (PSI).

alagan
Télécharger la présentation

DEPARTMENT OF TRANSPORTATION

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure Replacement of Route 31 over Canandaigua Outlet with Deck Bulb Tees (DBT) Mathew Royce PE OFFICE OF STRUCTURES

  2. WHY DBT?

  3. PROJECT INTRODUCTION

  4. Design and Construction Issues

  5. UHPC Joint

  6. DUCTAL UHPC CUBE BREAKS (PSI)

  7. CURING

  8. UHPC Closure Pour Joint Testing Project

  9. UHPC Closure Pour Joint Testing Simulating Deck Panel Cxn Simulating DBTee Cxn

  10. UHPC Closure Pour – Cyclic Testing Precast Panel UHPC Precast Panel Wheel Patch Above Here 7’ between Simple Supports 7’ Wide Specimen Panel G1/G2 – After 5.8 Million Cycles to 21.3 kips

  11. UHPC Closure Pour – Cyclic Testing Precast Panel UHPC Precast Panel 0.001” (0.03 mm) 0.003” (0.08 mm) crack 0.001” (0.03 mm) 0.005” (0.13 mm) crack UHPC structural cracks tend to measure approximately 0.0002” (0.005 mm) Panel G1/G2 – After 5.8 Million Cycles to 21.3 kips