Lee County's Roadway System: Mission, Objectives, and Future Plans

niabi avatar
24 diapositives · 378 Views · Jul 09, 2013

The Lee County Department of Transportation is committed to planning, designing, constructing, operating, and maintaining a comprehensive roadway system. Operating under federal and state mandates, key initiatives include traffic management, long-range planning in collaboration with the MPO, maintenance of road systems, and advancement of safety standards. Future projects will focus on enhancing infrastructure, improving pedestrian and bicycle pathways, and addressing funding shortfalls to ensure sustainable development and community safety for years to come.

Lee County's Roadway System: Mission, Objectives, and Future Plans - slide 1
01 / 24Lee County's Roadway System: Mission, Objectives, and Future Plans
1 / 17

Télécharger la présentation

Lee County's Roadway System: Mission, Objectives, and Future Plans
Une image / un lien ci-dessous est fourni (tel quel) pour télécharger la présentation

Politique de téléchargement : le contenu du site vous est fourni TEL QUEL pour votre information et votre usage personnel ; il ne peut être vendu, concédé sous licence ni partagé sur d’autres sites sans l’accord de son auteur.Le contenu vous est fourni TEL QUEL, pour votre information et votre usage personnel uniquement. Téléchargez la présentation en cliquant sur ce lien. Lors du téléchargement, si vous ne parvenez pas à télécharger une présentation, l’éditeur a peut-être supprimé le fichier de son serveur.Pendant le téléchargement, si vous ne parvenez pas à obtenir une présentation, le fichier a peut-être été supprimé par l’éditeur.

F I N

Plus de contenu associé

Transcription de la présentation
  1. DEPARTMENT OF TRANSPORTATION

  2. Mission Statement Plan, Design, Construct, Operate and Maintain the roadway system under the jurisdiction of Lee County

  3. DOT Organization • Engineering Services • Traffic • Operations • Tolls • GIS

  4. Federal/State or Regulatory Agency Mandated • Superintendence and control of County road system FS 336.02 (1) (a) • Clean Water Act Section 402, FS 373 • National Bridge Inspection Standards 23 CFR Part 60 • Drawbridge operation 33 CFR Part 117 • Regulatory Sign and Signal Maintenance FS 316 • Update/Maintenance of Transportation Element of Lee Plan and CIP FS 163 • Maintenance/Reporting of County Road System

  5. Comprehensive Plan Mandated • Long range planning with the MPO (36.1.1 and 42.1.1) • Prepare and implement financially feasible CIP (37.1) • Maintain adopted LOS standards (37.1.1) • Maintain/update roadway service volumes (37.1.2) • Traffic Count Program (37.1.3) • Traffic signal progression program (40.2.2) • Monitoring and improving signals, signs, street lighting and lane markings on all roadways (40.2.2) • Traffic safety studies (40.2.3) • Traffic signal/intersection improvement program (40.2.7) • Leescape Plan and RLAC (40.3) • Bicycle/Pedestrian system and BPAC (40.4.2-40.4.8) • Neighborhood Traffic Control Plans/Traffic Calming (41.1.3) • Coordination of transportation facilities with other agencies (42.1)

  6. Historical/Board Directed • Roadway Landscaping Program • Arterial Streetlights • Non regulatory road signs • Controlled Access Roadways • ROW permitting and regulations • Signalization Retiming and Operations Center

  7. Cost of Core Services • Mandated $27,480,000 • Comp Plan $ 14,490,000 • BoCC/Historical $ 4,180,000 Total $ 46,150,000

  8. Where Have We Been?

  9. Five-Year Historical Data

  10. Five Year HistoryApproved Positions

  11. Major Increases or Declines • Implementation of Signal Operations Center  • Landscape program  • Asset Management System  • Material costs  • Arterial street lighting program  • Contracted services 

  12. Where Are We Today?

  13. Positions • 394 approved positions • 9 vacant positions

  14. Cost Reductions and/or Efficiencies • Eliminated in house surveying • Reduction in 42 positions and corresponding Fleet since FY 2007 • Terminated Interlocal agreements with municipalities except for traffic signals

  15. Major Issues and Long Range Projects • Long range plan update with MPO • Coordination of large developments – Red Sox Stadium and Babcock Ranch • Bike lane/complete streets • Road resurfacing shortfall • Bridge Replacement (Big Carlos) • Upgrade of Signal System • State mandates for sign retro-reflectivity • Bridge Incident Management System • Increased mileage of roadway and landscaping to maintain • Revenue shortfalls for capital improvements

  16. Where Are We Going?

  17. Three Year Revenue/Expense Projection

  18. Core Services Engineering Services • Long range planning – 20 year horizon • Transportation related development review activities • Bicycle/Pedestrian planning, programming and committee administration • ROW inventory • Design and construction of capital projects • ROW permitting • Resurfacing program

  19. Core Services Landscape Program • $32 million investment • 184 centerline miles landscaped • $1.75 million contract budget • Large tree/palm trimming • Irrigation maintenance and repair • Spraying and fertilization

  20. Core Services Canal Program • Quarterly mowing of 163 miles of canal ROW, 211 weirs and 67 retention ponds • Maintenance of primary drainage canals for hydraulic function 12-14 month cycle • Chemical application for aquatic vegetation control in canals and flood prone ditches

  21. Core Services Road/Bridge Programs • Mowing and maintenance of 2,422.85 miles of ROW, on a 4-8 week cycle in high visibility or 8-10 weeks in rural areas • Quarterly sweeping of curbed sections • 425 miles of sidewalks and bike paths • Maintenance of ditches, swales and drainage culverts • Maintenance of 130 bridges, 3 bascule and over 150 box culverts • 50.3 miles of handrail and guardrail maintenance and repair

  22. Core Services Traffic Section • Maintain over 96,000+ signs • Refurbish annually 1,700 miles of pavement markings, 16,000 raised pavement markers and 1,000 intersections • Operate and maintain 395 traffic signals • Maintain county-wide database of crash statistics • Prepare traffic data collection and prepare traffic studies • Operate 15 hour per day coverage of Signal Operation Center • Maintenance of 4,873 arterial street lights

  23. Cutback/Reduction Options • Use contracted services for design and construction of capital projects • Reduce maintenance cycles throughout • Not replace non regulatory signs • Decrease staffing and hours of Signal Operations Center • Reduce agreements with constitutional offices • Eliminate staff support to committees (BPAC and RLAC) • Arterial Street Lighting • Landscaping

  24. Enhanced Revenue Options • Implement drainage utility • Increase/expand toll system • Increase permit fees • Shift local option gas tax revenue from capital to fund O&M