Muon LS1 Status

Muon LS1 Status. Outline Muon activities recap and EE status I nterventions. Zhen Yan April 30 th 2013. Muon activities recap. Barrel MDT VME crates were turned off Protection forms were installed on barrel MDT chambers(sector 7A)

alaqua
Télécharger la présentation

Muon LS1 Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Muon LS1 Status Outline • Muon activities recap and EE status • Interventions Zhen Yan April 30th 2013

  2. Muon activities recap • Barrel MDT VME crates were turned off • Protection forms were installed on barrel MDT chambers(sector 7A) • The electrical reshuffling for the CSC rack Y28.16A1 and rack Y26.16A1 in USA15 • DCS security patch on April 29th • Continue RPC cabling work on sector 12&14 • sRPC chamber extraction?

  3. EE status • Chamber installation done • Readout service connection done • 2 Fiber problems remain • Alignment done • All EEL and EES sectors chamber and alignment bars positioned • Gas pipe connection • 2 sectors EES1A02 and EES1A08 remain • Commissioning on going • Organized 3 training sessions for 12 new comers • Started the shift at April 16th (2 persons per day) • Opened booking for May 6th to May 20th yesterday • More details in Liang’s presentation • Many thanks for the DCS on call experts for providing supports

  4. Interventions • Interventions • P1 electrical installations and interventions on safety systems from April 30th to May 5th • P1 in shutdown mode and no cavern work allowed • Muon detectors had been fully turned off yesterday • MDT and CSC gas will run normally, RPC gas had been stopped yesterday. • CERN wide power limitation on June and July 2013 • (UPDATE) Run part of detectors is possible upon the request, please let me know as soon as possible if you need the power consumption during June and July • Crane maintenance and cooling intervention on September and October 2013 • Stop surface cranes (SDX1 and SX1) from September 3rd to September 12th • Stop UX15 cranes from September 23thto September 27th • Muons C pump redundancy from October 7th to October 9th • MuonsA pump redundancy from October 14thto October 16th