This document outlines the insights shared by team members regarding the migration to TDAQ-05 and SLC6 for the SBCs and detector computers during LS1. It highlights the new data sampling methods, upcoming changes in the off-detector readout systems, and plans for the RPC and TGC sub-systems. Key points include the decommissioning of older systems, improvements in readout rates, enhanced configuration management, and addressing noise issues related to the TGC firmware. These developments aim to streamline operations and improve data integrity.
Updates on Muon DAQ System Changes and Future Plans for LS1
E N D
Presentation Transcript
Muon DAQ work during LS1 Info collected by Daniel from : Enrico, Francesco, Masato, Michael, Nicoletta, Stephanie, Thei
Foreseen Central DAQ changes • Migration to tdaq-05 --> migration to SLC6 for the SBCs and detector computers. Spring 2014 ? • Experience shows: usually painless, but needs to be synchronized (drivers,…) • Data sampling for DQ will not be done anymore at the event builder nodes (which will not exist anymore), but through the trigger, using a new “monitoring stream”. To be presented/discussed tomorrow
CSC plans • Old off-detector readout system needed at least until December 2014 to re-commission the wheels once they are both back in working position • New off-detector readout system under development: • Run at 100kHz L1 rate w/o deadtime • Implement ROD stop-less removal/recovery • Implement TTC restart • Abandon the txt files for loading the calibration results into the RODs in favor of using COOL • Improve OKS description to feed the status of resources
MDT plans • Working on an MROD with a second output and with that, one can split the towers with the high rates. • 48 extra read out links and only a few (8 ?) extra MRODs need to be installed.
RPC plans • Fairly extensive review/rewrite of the RPC Lvl1/DAQ software • Upcoming update of the CAN interfaces which requiring porting the software to the new API • Move the configurations to a database • Improve configuration time of the trigger towers and make recovery of misalignments during runs more robust. • Better integrate the RODs and their relative SLs to solve some reconfiguration and timing issues.
TGC plans • Try to reproduce “FE noise burst” problem with test-bench in Blb 188. If something found, will try something with the standalone or global, July~August. • DAQ needed for development of the new Sector Logic firmware. Plan to do some tests using the standalone partition, around May~June. • Later, could try to speed up the access to configuration d/base and the actual configuration. • Work needed in the condition d/base area. Goal: go as standard as possible.
Central issues • "MUON" standalone partition, to run TGC + MDT, RPC + MDT with a muontrigger; setting this up with the LTPI involves work. Do we want it ? • Keeping track of active/inactive/abandoned/removed detector elements in a common way • MRS and TDAQ messaging service. MuonsDDC makes some non-standard use (callbacks hooked to the exchanged messages). Do we want to improve on this?