1 / 17

WP4 - Design Studies

WP4 - Design Studies. Outline. Status of FP6 Design Studies Consequences High power targets MICE Neutrino detector R&D FFAGs WDS Status. FP6 Design Studies. ESGARD meeting 3 rd September – from Roy Aleksan. Originally: 3 DS calls, November 2003 , 2004, 2005

aman
Télécharger la présentation

WP4 - Design Studies

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WP4 - Design Studies

  2. Outline • Status of FP6 Design Studies • Consequences • High power targets • MICE • Neutrino detector R&D • FFAGs • WDS Status

  3. FP6 Design Studies ESGARD meeting 3rd September – from Roy Aleksan • Originally: 3 DS calls, November 2003, 2004, 2005 • Now: 0 or 1 call if 1, autumn 2005, deadline spring 2006 • Two reasons: - want to fund additional projects from round 1 70MEUR  90MEUR - big budget reduction (next I3: 60M  140M) • Leaves 30-40MEUR for round 2 • Only question: is it worth holding another DS for this! • Possibility had been known for some time • RA asked Brussels if new JRA in CARE possible Answers to both by end September

  4. Joint Research Activities • We are currently assuming a positive response • ESGARD will review possible JRAs and select a few - NF - HIPPI - NED - HHH - LC - SRF - PHIN • Call likely to be November • Deadline March-April 2005 • 140MEUR

  5. Joint Research Activities • Aim of a JRA…….. “The joint research activities aim to improve or enhance the service provided by [an existing infrastructure], in such a way that it could have widespread significance to a number of research communities in Europe. “Joint research activities should be innovative and explore new fundamental technologies or techniques underpinning the use of infrastructures by several research communities.” • Maximum 5MEUR from EC

  6. FP6 Design Study

  7. Possibilities High power target JRA • Would need to be as generic as possible - HIPPI • Include: - solid & liquid targets - CNGS, T2K, NF, others……… • No funding before 2006: - final construction, running, analysis of TT2A - analysis of solid tests - interpretation for target station - design of real target - design of TS - safety analysis • Potential EU participants: Cranfield, Glasgow, RAL, Sheffield, CERN, NRG; FGES • Roger has plans for CARE meeting, seminar tour

  8. Possibilities MICE/Front-end JRA • Needs to have finances sorted out • Needs careful selection of project: - upgrade of existing infrastructure - use by several research communities • Possible projects from VP - MICE 0: high precision emittance measurement - RF: windows, in magnetic field? - efficient pulsed 200MHz RF power amp? - high Tc SC magnets - others! • Potential EU participants: lots!

  9. Possibilities Detector R&D I3 • CARE is accelerator R&D I3 • Detector R&D I3 is also possible! • In ESGARD: - Neutrino detectors - LHC upgrade - linear collider • Seems too complex & impossible to organise in time • Candidates should contact Roy! • Is a Neutrino Detector R&D I3 possible?

  10. FFAGs Japanese layoutNo cooling!

  11. FFAGs US layout Much reduced cooling!

  12. FFAGs Prototype for proton cancer therapy neutron production (BNCT)

  13. FFAGs In addition • 150MeV FFAG at Kyoto University to study ADS • ion FFAG at National Institute of Radiological Sciences, Chiba, for ion cancer therapy • Mitsubishi: proton & ion FFAG for cancer therapy electron FFAG for CT scanning, industrial irradiation • interest in UK for proton therapy & ion implantation • PRISM at Osaka for rare muon decays • proton upgrades at BNL, FNAL, KEK • 10GeV electron FFAG at BNL for eRHIC • LHC intensity upgrade (Almost) all scaling machines

  14. Scaling vs Non-scaling • Non-scaling:- smaller, simpler (cheaper) magnets - smaller circumference - smaller variation in orbit time with energy • Problems: tune changes  resonances acceleration outside buckets • Tune variation is rapid ( + muons make few turns) • But this and other features must be tested • Assessment of scaling and non-scaling for other appl.

  15. UK FFAG e-model FFAG • Plan: build electron model non-scaling FFAG - ~10 to ~20 MeV - 15-20m circumference • If successful  major impact on accelerator physics • EU needs more involvement in NF R&D • UK needs to get more involved in FFAGs in general • A lot of money for accelerator R&D in UK • DL has electron injectors Build e-model at DL! • Lots of enthusiasm from ASTeC • Large group formed to do this: Canada, Europe, Japan, US • Interest from IBA, starting to attract potential customers • Will target specific EU labs

  16. FFAGs in FP6 Several possible candidate programmes: • DS in 2005, probably too late • New and Emerging Science and Technology - Insight - Pathfinder - Adventure “Adventure projects are ‘visionary’ research projects, aiming to create and/or develop new opportunities for science and technology which could have a very high potential payoff in the long term, in particular in new interdisciplinary areas. They are identified by their characteristics of significant novelty, very high ambition and high impact.” • Combating cancer • Waste transmutation • Clearly something EC is interested in funding • Will take advice when FP6 situation is clearer • It is also something EPSRC should be interested in!

  17. WDS Status • Not started yet - EU situation - Study 2a • Plan is still to start “soon” • At NuFact’04: - should set a long term goal for the NuFact series cost optimised Neutrino Factory - should set goals for each NuFact to reach this •  WDS • Aim to start discussion on this after Villars, Study 2a

More Related