Innovative Single-Story Dwelling Design: Sustainable Materials and Efficient Layout

This project outlines the construction of a single-story dwelling with a total square footage of 4,127.2 sq. ft. It emphasizes the use of sustainable building materials like cork flooring for insulation, fiberglass siding for durability, and environmentally friendly Durra panels for drywall. The layout includes one room per person for optimal studying and sleeping, with gender-divided bathrooms and a laundry room equipped with six washer/dryers. The project timeline guides through each construction phase, highlighting key tasks from site clearing to final finishes.

andie
Télécharger la présentation

Innovative Single-Story Dwelling Design: Sustainable Materials and Efficient Layout

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IET 120 Construction Project Andrew Grigsby

  2. Dwelling • Single Story

  3. Square Footage • Square footage of each floor • 4127.2 Sq. ft. • Square footage total • 4127.2 Sq. ft.

  4. Location

  5. Building Materials • Cork Flooring for better insulation • Fiberglass Siding for durability and low maintenance • Durra Panels for drywall because they are made of environmentally friendly material

  6. Building Materials • Icynene for insulation • Metal roofing

  7. Floor Plan Layout • I used one room per person because it makes studying and sleeping easier. I divided the bathrooms by gender and included a laundry room with 6 washer/dryers. The dwelling has one lounge room and one kitchen/dining room.

  8. Timeline • Week 1: Clear and level the lot • Week 2-4: Foundation work • Week 5-12: Exterior walls, subfloor and roof • Week 13-16 Finish outside of house, get started on plumbing, hvac, and electrical • Week 17-24 Put up drywall and install cabinets and install flooring • Week 25-32 Finish plumbing and electrical work. Paint and caulk

  9. Conclusion • I learned about many building materials that can be used such as siding and flooring as well as new sites that can be utilized to estimate costs of jobs.