andra
Uploaded by
10 SLIDES
209 VUES
100LIKES

Project Proposal for iGEM 2007 - Project Specifications -

DESCRIPTION

This proposal outlines a project aimed at creating a genetically engineered pH buffering machine using E. coli. The primary goal is to detect and maintain a neutral pH within biological systems, leveraging pH-inducible regulatory elements and optimized gene expression. This initiative addresses the absence of well-characterized pH-regulatory parts in the BioBrick registry, making this project innovative and essential. Background research on pH regulation and expression kinetics will guide the development process, with steps planned for the incorporation of various pH-sensitive components.

1 / 10

Télécharger la présentation

Project Proposal for iGEM 2007 - Project Specifications -

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Detect pH of a system • Maintain a neutral pH in the system Project Proposal for iGEM 2007- Project Specifications - Genetically Engineered pH Buffering Machine • Report pH of a system

  2. Standard buffering reagents get used up Breaking ground: • No well-characterized pH-inducible/ pH-regulatory parts in • the BioBrick registry to date Project Proposal for iGEM 2007- Project Specifications - • pH is an important parameter Why is the project worth pursuing?

  3. Project Proposal for iGEM 2007- Background Information- Kinetics of expression of the E.coli cad operon as a function of pH and lysine. Melody N. Neely and Eric R. Olson. Journal of Bacteriology. Vol. 178, pp5522-28 (1996)

  4. Project Proposal for iGEM 2007- Background Information- Characterization of a pH-inducible promoter system for high-level expression of recombinant proteins in E.coli. Chou et al. Biotech and Bioeng. Vol. 47, pp186-192 (1995)

  5. IPTG Low pH LacI RFP CadC GFP Pconst PLac PCad CadC LacI RFP GFP Cell growth Total Pcad induction Specific Pcad induction pH 6.0 6.5 7.0 7.5 8.0 Project Proposal for iGEM 2007- Project Plan - (stage 1) E.coli cell

  6. IPTG Low pH LacI RFP CadC HrpR GFP Pconst PLac PCad LacI CadC HrpS Urease HrpR RFP HrpS HrpR HrpS Urease PAra PHrpL AraC Project Proposal for iGEM 2007- Project Plan - (stage 2) E.coli cell

  7. Urease + Urea Carbon dioxide Ammonia Project Proposal for iGEM 2007- Project Plan - (stage 2) pH increases √

  8. TetR CadC LacI HrpR TetR HrpR HrpS RFP Urease HrpS Lactate dehydrogenase HrpS Urease PAra PHrpL PTet Lactate dehydrogenase AraC IPTG Project Proposal for iGEM 2007- Project Plan - (stage 3) Low pH LacI RFP CadC HrpR GFP Pconst PLac PCad E.coli cell

  9. Pyruvate Lactic acid Lactate dehydrogenase Project Proposal for iGEM 2007- Project Plan - (stage 3) pH decreases √

  10. Project Proposal for iGEM 2007- Possible Challenges - • Calibration of pH vs. fluorescence • Expression of urease and lactate dehydrogenase • - Use alternative pH-changing enzymes • - e.g. amino acid decarboxylases/ deaminases

More Related
SlideServe
Audio
Live Player
Audio Wave
Play slide audio to activate visualizer