The concept of barrel plating has taken a tumble

The concept of barrel plating has taken a tumble. Tumbleplater Presentation Contact us. A revolutionary concept to replace conventional barrel plating with:. Increased Plating Speeds Greater Uniformity of Deposits Reduced Dragout & Chemical Usage Greatly Reduced Waste Treatment Costs.

arden
Télécharger la présentation

The concept of barrel plating has taken a tumble

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The concept of barrel plating has taken a tumble

  2. Tumbleplater Presentation Contact us

  3. A revolutionary concept to replace conventional barrel plating with: • Increased Plating Speeds • Greater Uniformity of Deposits • Reduced Dragout & Chemical Usage • Greatly Reduced Waste Treatment Costs

  4. Tumbleplaterprocessing advantages: • Completely Automated • Quick and Easy Access for Sampling • Ability to Plate, Rinse & Dry In-line • Space Saving Configurations

  5. Increased Speed and Deposit Uniformity Faster plating rates and deposit uniformity, unlike any other barrel plating technology available in the market today.

  6. Completely Automated The unique tilting basket provides movement of the parts from station to station without the use of hoists, superstructures, or cables.

  7. Space Saving Designs Tumbleplater lines can be designed to fit a wide variety of floor plans with no loss of efficiency. Increased rates of deposit combined with the requirements for fewer rinse stations, result in a significantly smaller system as compared to a conventional barrel line of equal capabilities.

  8. Easy Access Quality control is made simpler and easier using the Tumbleplater. Instant availability allows for quality review and sampling during plating.

  9. Reduced Dragout and Chemical Usage Dragout is decreased at least 75% by volume over conventional barrel plating, resulting in chemical savings as well as significant reductions in waste treatment costs.

  10. State-of-the-art PLC Controls This easy to operate user interface provides screens for custom programming of all controls including processing times, rectifiers and temperatures. Control settings also allow for different process times and current densities for each load to be programmed and easily tracked.

  11. 93 Optional Load Scale

  12. Individual Recipes Follow Loads Tumbleplater loads can be custom processed and tracked with multiple recipes Station 5 Station 3 5 3 Station 1 1

  13. Optional Fume Control Options can include individual station enclosures for cost effective removal of fumes from the process area.

  14. Clean, Plate, Rinse and Dry In-line Because only the parts are transferred from station to station, all your processing, including cleaning and drying can be done in-line.

  15. Load position

  16. Hopper rotation to processing position

  17. Hopper rotation to processing position

  18. Hopper rotation to processing position

  19. Hopper rotation to processing position

  20. Hopper rotation to processing position

  21. Hopper rotation to processing position

  22. Hopper belt rotation

  23. Anode proximity to the plating process

  24. Solution Sparger proximity to the plating process

  25. Hopper rotation to transfer position

  26. Hopper rotation to transfer position

  27. Hopper rotation to transfer position

  28. Hopper rotation to transfer position

  29. Solution drain-off

  30. Dragout Dragout Return

  31. Hopper rotation to transfer position

  32. Hopper rotation to transfer position

  33. Transfer belt rotation

  34. Completed Transfer

  35. Rinse Cycle

  36. Rinse Cycle

  37. Rinse Cycle

  38. Rinse Cycle

  39. Rinse Cycle

  40. Fresh Water Rinse Cycle

  41. Skip Station Option Processing Bypass

  42. Multi Station Option Multi Process Option

  43. Multi Station Transfer Shuttle