SlideServe
Menu
Préférences
© SlideServe · v2026

Row River Trail Corridor Plan

ardice avatar
26 diapositives · 596 Views · Jul 11, 2014

Row River Trail Corridor Plan. Corridor Plan and Meeting Objective Project Background Short Term Improvements Long Term Improvements/Corridor Planning Construction Funding Opportunities Milepost 4.0 Why Corridor Planning Other intersections/observations Questions/comments

Row River Trail Corridor Plan - slide 1
01 / 26Row River Trail Corridor Plan
1 / 17

Télécharger la présentation

Row River Trail Corridor Plan
Une image / un lien ci-dessous est fourni (tel quel) pour télécharger la présentation

Politique de téléchargement : le contenu du site vous est fourni TEL QUEL pour votre information et votre usage personnel ; il ne peut être vendu, concédé sous licence ni partagé sur d’autres sites sans l’accord de son auteur.Le contenu vous est fourni TEL QUEL, pour votre information et votre usage personnel uniquement. Téléchargez la présentation en cliquant sur ce lien. Lors du téléchargement, si vous ne parvenez pas à télécharger une présentation, l’éditeur a peut-être supprimé le fichier de son serveur.Pendant le téléchargement, si vous ne parvenez pas à obtenir une présentation, le fichier a peut-être été supprimé par l’éditeur.

F I N

Plus de contenu associé

Transcription de la présentation
  1. Row River Trail Corridor Plan • Corridor Plan and Meeting Objective • Project Background • Short Term Improvements • Long Term Improvements/Corridor Planning • Construction Funding Opportunities • Milepost 4.0 • Why Corridor Planning • Other intersections/observations • Questions/comments • Breakout Sessions and Dot Exercise

  2. Corridor Plan and Meeting Objective

  3. Layng Road Short term improvements – began by looking at what would be installed immediately to improve safety

  4. Row River Road MP 4.0 Short term Intersection Improvements at Row River Road MP 4

  5. Row River Road MP 5.8 • Short term intersection improvements at Row River Road MP 5.8

  6. Row River Road MP 5.8 • Short term Intersection Improvements at Row River Road MP 5.8 included grading and vegetation removal to increase sight distance for trail users.

  7. Row River Road MP 11 • Short term Intersection Improvements at Row River Road MP 11.0

  8. Row River Trail Long Term Improvements - Corridor plan

  9. Funding Opportunities for Construction Improvements • Construction grant cycles have started: • Transportation Enhancement (TE) – pre-application due past spring; application due 12/14 • State Transportation Improvement Program – deadline was 11/27/2012 for application • Federal Lands Access Program (FLAP) Pre-application due 12/13/2012; application due 1/25/13 • Will continue to seek opportunities

  10. Row River Road MP 4.0

  11. Engineering 101 • How do we address intersection safety? • Educate • Enforce • Engineer - engineering options based on yielding • Urban areas of trail –bicyclists/pedestrians have right-0f-way - motorists must yield to bicyclists/pedestrians.

  12. Engineering Alternatives • Engineering options based on yielding • Rural areas of trail - motorist has right-of-way. Bicyclists/pedestrians must yield to motorists

  13. Separated Grade Crossing • Completely separates motor vehicles and pedestrians/bicyclists • Safest option for all users • Most expensive option

  14. At Grade alternative: PHB • Pedestrian Hybrid Beacon (PHB) • Changes the yielding relationship – pedestrian/bicycle users push the beacon to stop traffic

  15. Overcrossing – Option 1

  16. Undercrossing – Option 2

  17. Undercrossing - Option 3

  18. Pedestrian Hybrid Beacon – Option 4

  19. We want to hear from you • What option do you favor best and least? • Overcrossing – Option 1 • Undercrossing - Option 2 (aligned with trail) • Undercrossing – Option 3(angled from trail; shorter tunnel) • At grade crossing (with PHB) – Option 4 • Do nothing – no further improvements

  20. Corridor Planning • Opportunity to evaluate entire trail

  21. Layng Road Crossing

  22. Row River Road MP 5.8

  23. Row River Road MP 11.0

  24. Next Steps for Project

  25. Next Steps for Today • Please provide your feedback about design alternative for MP 4.0 • Indicate most and least favored with dots • Please provide your feedback about any other issues along the trail • Make notes on large maps and intersection maps • Fill out comment cards • Talk with staff