An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EVDAENERGO SOLAR POWER STATION

  2. General data Location – Odessa region, Liubashevskyi district, near the village Troitskoie and village Mykhailovka outside the settlements Installed capacity - 4.03 MW*peak The estimated annual generation of solar power station - 4949 MW*h Land plot Area - total area of 10 hectares Cadastral number – 5123382900:01:001:0172 Term of land lease - 49 years Intended purpose - for the construction and operation of solar power station Additional information The surface with slight elevation changes and homogeneous soil The absence of tall vegetation (steppe) Snow cover is formed for 3-4 months, its thickness is 5-7 cm High solar activity in the region Distance to the highway Odessa - Kiev is 3 km EVDAENERGO SOLAR GENERAL INFORMATION Ground solar power station EVDA ENERGO with installed capacity of 4.03 MW in the Odessa region is intended for marketing of generated electric power in the network of by “green” tariff

  3. Features of SPS Peak capacity - 4.03 mW The estimated annual generation of SES - 4949 MW*h The annual output of electricity for marketing - 4897 MW*h Green tariff– 476 kopecks/kWh*h Location – Odessa region Number of modules (PV) - 16 368 Type of solar modules – CSUN 235-60P, CSUN 240-60P, CSUN 260-60P Number of inverter stations – 3 Type of inverter stations – AEG TKS-C 1250 (1,25 MW) Transformer substation – КТПГС–400/10/0,4–У1 Reduction of CO2 - about 4 000 tons per year Date of commissioning - September 2016 Lifetime of the project - 30 years Process connection The generated electric energy will be transferred to a distribution network of 110 kV through 110/35/10 kV substation and a transmission line of 10 kV, and will be marketed in the network at tariffs set in accordance with the law of Ukraine on the “green tariff”. EVDAENERGO SOLAR GENERAL INFORMATION

  4. EVDAENERGO SOLAR CURRENT STAGE OF PROJECT IMPLEMENTATION

  5. Solar power station is power generation facility based on the conversion of solar energy into electricity. SPS is placed in open areas. Principle of operation is as follows: direct current electricity, generated at photovoltaic modules after conversion on inverters and transformers is submitted to the transformer stations to the existing power grids. EVDAENERGO SOLAR PRINCIPAL SCHEME OF SPS PROJECT Photovoltaic modules convert solar energy into direct current electric power.PVMs are combined into chains. Switching boxes is combination of PVM chains for connection to the inverter inputs. Inverter - converts direct current ofPVM into alternating current forfurther transformation. Transformers - increase the tension in the SPS network to desired values attransformer substation. Inverter Photovoltaic modules External power grid Input counter AC 10 kV DC “Green” counter Transformer 0.4/10 kV Self-consumption Monitoring system Cable lines – the transfer of electrical power to transformer substation for connection of SPS to power grids.

  6. Features of substation The substation 110/35/10 “Troitskaia” is equipped with two transformers of TDTNG 10000/110 type with the capacity of 10 MVA each The substation has two voltage levels - 110/10 kV The distance from the substation to SPS is 200 m Features of connection Reconstruction of the ОRU-110 kV and KRUN-10 kV, OPU equipment reconstruction SPS connection is carried out on the side of medium voltage of 10 kV SPS is connected to a underground line substation with the length of about 200 m Activities on connection are completed within 4 months after the date of payment of the advance payment under the contract EVDAENERGO SOLAR TECHNOLOGICAL CONNECTION OF SPS Safety MeasuresIn addition to inverters that are synchronized with the network and disabled at deviation of the parameters from the set values, RU, equipped with a set of necessary protections, is included to the composition of SPS

  7. Economic effect Investments in the economy of Ukraine Development of alternative energy projects and contribution to energy independence of the country Annual tax revenues to budgets of different levels for the entire period of operation of the SPS EVDAENERGO SOLAR EFFECT FROM IMPLEMENTATION OF THE PROJECT • Energy effect • Annual electricity generation in power grid of Ukraine isabout 5000 MW*h • Increase in volume of energy supply in the region and the reliability of the power system as a result of the reconstruction of the substation “Troitskaya” • Ecological and social effects • Introduction of “green” generation - increasing the image of the region and country • Reduction of CO2 emissions to 4 000 thousand tonnes per year • Creation of new high-tech jobs at the construction and operation of the SPS

  8. EVDAENERGO SOLAR PHOTO OF SPS EVDA ENERGO

  9. EVDAENERGO SOLAR PHOTO OF SPS EVDA ENERGO