Introducing a Shared Inspection Management System: Approaches in Practice

Inspection Reform: Approaches and New Trends in Effective Regulatory Delivery Intercontinental Hotel, Amman, Jordan, June 2-3. Introducing a Shared Inspection Management System: Approaches in Practice. GORAN VRANIC, IT Consultant. SIMS OBJECTIVES AND TASKS.

armand
Télécharger la présentation

Introducing a Shared Inspection Management System: Approaches in Practice

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Inspection Reform: Approaches and New Trends in Effective Regulatory DeliveryIntercontinental Hotel, Amman, Jordan, June 2-3 Introducing a Shared Inspection Management System: Approaches in Practice GORAN VRANIC, IT Consultant

  2. SIMS OBJECTIVES AND TASKS

  3. ALIGNMENT WITH REGULATORY, REGISTRATION, LICENSING AND INSPECTION REFORMS • Defining a strategic approach to inspection reform that includes SIMS IT initiative • (Re)Design of inspection processes (process regulation improvement, e.g. horizontal law on inspections) • Identification of substantive regulations’ requirements and inspection checklists preparation • Interoperability with businesses and licenses registries • Identification of risk indicators and design of risk models and algorithms • Organizational improvements and capacity building (e-Readiness)

  4. SIMS STRUCTURAL ENTITIES ORGANIZATIONAL AND PROCESS FRAMEWORK INSPECTION SYSTEM SURVEILLANCE SECTORS INSPECTORATES INSPECTION ACTIVITIES • LICENSE TYPES • BUSINESS ACTIVITIES OBJECTS TYPES • PRODUCT TYPES FRAMEWORK OF SUBSTANTIVE REGULATIONS KNOWLEDGE DATABASE INSPECTION CHECKLISTS INSPECTION CHECKS IRREGULARITIES INSPECTION MEASURES

  5. SIMS SOFTWARE ARCHITECTURE REGISTER OF BUSINESSES, OBJECTS, LICENSES AND PRODUCTS established based on data exchange with state registries PLANNING MODULE multi-annual, annual, operational plans , joint inspections plan and inspectors’ schedules RISK MANAGEMENT MODULE risk-based planning, comprehensiveness planning, adequate selection of inspection measures E-INSPECTIONS PORTAL AND INTEROPERABILITY (G2B, G2C) checklists registry, complaints, risks and self-assessment INSPECTION CHECKLISTS’ MANAGEMENTMODULE checks, irregularities, measures, regulations DOCUMENT/CASES MANAGEMENT MODULE office record management, support for mobile devices KNOWLEDGE DATABASE MODULE inspection preparation, inspection s’results, decision support INSPECTION STATISTICS MODULE plans’ execution, KPI time series , taken measures, checks and indicators, geo-positioning BORDER INSPECTION MANAGEMENT event-driven, integration with customs and IBM systems, online trackng of cases, integration with rapid-alert systems INSPECTION FUNCTIONS AND ORGANIZATION MODULE surveillance sectors, organizational structure, jurisdictions, inspectors and competences

  6. Bosnia / RS Approach (Complex SIMS) – 10 steps SIMS implementation “Regulatory Guillotine” Driving regulatory reform 1 2006-2007 teams with a total of 40 inspectors worked on inventory of inspection related measures and development of procedures Inspection checklists development 2 Inspection processes redesign 3 ICT infrastructure establishment ICT capacity building 4 2007-2008 basic ICT infrastructure implemented to support basic ICT services and inspection reporting software as a proof of concept Proof of Concept implementation 5 ECDL computer literacy training 6 Application software implementation Application software development 7 Application software deployment 8 2008-2009 final design of the software prepared and rolled out with support of 17 inspector trainers. Internet site and inspection checklists published. Proof of sustainability 9 Transparency improvements 10

  7. Bosnia / RS Approach (Complex SIMS) – Effects BEFORE TODAY Inspection procedures were unknown and requirements unclear All inspection checklists and regulations are available over the Internet Time spent on inspections were measured in days during a year Average duration of on-site inspections is around 6 hours during a year Connection with the Inspectorates was weak and based on written complaints Complaints could be reported through the online complaints system Inspection documents were unreadable, unstandardized and unclear All inspection documents are prepared in an electronic way by using standardized templates Inspectors were issuing penalties each time when they found significant irregularities Based on available inspection history, “inspection measures pyramid” was applied in choosing right measures

  8. Cambodia ApproachShort-term (basic single inspectorate IMS) and long-term plan (shared IMS)

  9. Online Demonstration and Demos – afternoon session - stay tuned • Bosnia/RS - Complex Shared IMS Example: Create inspection case, fill-in inspection checklists and generate inspection report and decision with inspection measures • Cambodia - Basic IMS Example: Generate automatically operational plan using simple risk algorithm(list of businesses that should be inspected based on calculated risks applying risk management module with risk categories and indicators)

  10. CONCLUSION and Q&A • Number of cases without irregularities increased for 5% in period 2010-2012 • Number of cases without significant irregularities increased for 3.5%in period 2010-2012(earlier without changes) • Statistically from the total number of businesses (around 40.000) at least 1,400 are doing business without hazards and significant irregularities • Estimating minimal financial damage as result of potential hazards to 10,000EUR the financial effect is minimum 14mil. EUR

  11. Thank you! goran.vranic@infoexpert.ba