1 / 5

Preliminary 12-12-13 IDT Debrief

Preliminary 12-12-13 IDT Debrief. 12/13/2013. 12-12-13 Deployment Test Debrief. Overall the Sixth Deployment test was another success Majority of BAs and MPs were on the call close to 60 min before IDT began 1 BA late to join and 1 MP missing

arnie
Télécharger la présentation

Preliminary 12-12-13 IDT Debrief

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Preliminary 12-12-13 IDT Debrief 12/13/2013

  2. 12-12-13 Deployment Test Debrief • Overall the Sixth Deployment test was another success • Majority of BAs and MPs were on the call close to 60 min before IDT began • 1 BA late to join and 1 MP missing • Able to start and stop the test on time as scheduled • Resources were brought online during the test; systems performed correctly • Coordinated Resource start worked well • Reminder: All Resources that come online for the remaining IDTs are requested to coordinate with BA and Gen Dispatcher at SPP. Please submit via RMS, Parallel Ops Quick Pick. • Small, natural CRD Event occurred; handled as expected • No big issues; overall, test managed and controlled well Brian Strickland

  3. 12-12-13 Deployment Test Debrief • Though a “Success” - areas of concern/opportunities to improve • SPP working on process to improve first 30-45 min of IDTs • Issues with ACE going into the test (ran at -300 to -400 for the first 30 minutes of the test – at one point went to -554 MWs) • Combination of factors: • IDT started with collective EIS BAs ACE negative • Wind Resources across the footprint was ramping down by ~300 MWs • A lot of Resources off dispatch • Number of Resources on Energy and being deployed UP accounted for ~300 of ACE • SPP reached out to a number of Resources • Ramp Sharing contributed, but was not main culprit • 2 CPS2 violations • 30 minutes into the test before SPP ACE crossed 0 • ACE was under control by 0700 for the reminder of the test • 0900 frequency dip on interconnect (ACE went to -200 to -250 range), overall was managed well Brian Strickland

  4. 12-12-13 Deployment Test Debrief • Though a “Success” - areas of concern/opportunities to improve • Ramp Sharing Off • 0655 Interval: SPP decided to put full Ramp Sharing on to clear more Reg • Turning Ramp Sharing “on” helps clearing, but MPs need to get on Deployment • SPP cleared ~300 MW and deployed 170 MW when Ramp Sharing turned on • Backed down to 50% Ramp Sharing after the 0700 interval • Ramp Sharing “off” at 0800 hour • After 0835 interval, SPP backed off RegCommitment ~200% • To that point, SPP was getting 300% of what was needed • Scarcity occurred Brian Strickland

  5. 12-12-13 Deployment Test Debrief • Though a “Success” - areas of concern/opportunities to improve • SPP working to improve internal process for Reg Selection • SPP hopes to help MPs with any systematic issues and ensure MPs are equipped to follow signals after Go-Live Brian Strickland

More Related