1 / 7

PIP Update

PIP Update. March 6 th 2013. Agenda. Summary Update Current Activities/Updates Startup Schedule Highlights Upcoming Talks, Reports, Meetings Updates/Talks: Elliott McCrory - Linac BPM Upgrades Dave Johnson - Progress with Linac Notcher Amplifiers. Update. General Info

aulani
Télécharger la présentation

PIP Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PIP Update March 6th 2013

  2. Agenda • Summary Update • Current Activities/Updates • Startup Schedule Highlights • Upcoming Talks, Reports, Meetings Updates/Talks: • Elliott McCrory - Linac BPM Upgrades • Dave Johnson - Progress with Linac Notcher Amplifiers

  3. Update General Info • Booster SS: Up and operating • SS Spares still in production (amps and PAs?) • All Solid State Modulator work completed (spares tested – RF12 and RF19 not installed) • Booster Absorber – commissioned – Salah is starting to test 3rd Kicker • Booster Aperture Scans and magnet moves – • Finished another move yesterday/alignment finished this morning • Scans later today – issue with larger beam adds complication • Booster RF cavity rework – RF1 work in progress • Tuners removed and being worked on • RF15 cooling off in Booster access area • Spare cavity has progressed – installing inner hardware to main cavity • Booster Ferrites – Dennis completed measurements on recent ferrites • Document with physical Measurements, Low Power Testing, High Power Testing - put in DB • Results – not good! New ferrites did not meet specs • Phone call to vendor yesterday – plan to try again – different bake temp – lower density • RFQ – Running well – waiting on trim magnet/building source B • HLRF – looking into how to write a new PO that gets the work started • Linac Modulator –? • Linac Notch – Talk today by D Johnson • Cogging – Waiting for Kiyomi time • Booster Shielding – Two rounds of scans – meeting today to go over data…. • MI Startup: Word is May – no change from last time – June 1st Startup comments (Fernanda, Todd, Mary) Studies forthcoming?

  4. Density measurements from recent testing of latest ferrites

  5. RFQ Injector Assembling B source Tuning on RFQ and Buncher phase/Amplitude control LINAC Linac tuning – to match Injector BOOSTER Finishing up access to move magnets at L22Four magnets moved and straight alignedRepair several RF stations Testing 3rdNotcher Transverse Pickup Installed and tested InsatllRF3 removed RF15

  6. Upcoming Talks Future Meetings: Feb/Mar • To be Scheduled: • Dave Augustine - Vacuum Installations Finished and in Planning • Jean-Paul Carneiro - TraceWin 3D Simulations of the Fermilab Linac • Bill Pellico - Loss Test Scans for Shielding Assessment • John Reid - Solid State Installation - Final Report • Pat Sheahan - Tuner Bias Supplies • Leonid Vorobiev - ORBIT Simulations on Booster Injection and Acceleration

  7. Upcoming • Reports (upcoming) • Update of PIP Design Report – Yearly update work • PIP talks/Special Meetings • Shielding (PIP people at 13:00 hours) • Budget Issues – • Working to address cost of spares • Additional Overhead Cost – impact still being looked at - Please use the E-Log to put general work in progress updates/photos – weekly would be nice – if progress is being made in task

More Related