1 / 13

PIP Update

PIP Update. June 26 th 2013. Agenda. Summary Update Current Activities/Updates Startup Plans Upcoming Talks, Reports, Meetings Updates/Talks: B Pellico – Recent Budget/Labor exercise Ken Domann – Project Controls Update. Update. General Info PreAcc Beam: Source Current > 70ma

diza
Télécharger la présentation

PIP Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PIP Update June 26th 2013

  2. Agenda • Summary Update • Current Activities/Updates • Startup Plans • Upcoming Talks, Reports, Meetings Updates/Talks: • B Pellico – Recent Budget/Labor exercise • Ken Domann – Project Controls Update

  3. Update General Info • PreAcc Beam: Source Current > 70ma • Switched to B source last week • Practice for operational switching • Tuned on new source which had several differences from source ‘A’ – achieved 40 ma into tank 1! • Linac Beam: Tank 1 in at ~ 40ma, Tank 3 ~29ma, Tank 7 ~26ma • Booster Beam: Tuning - studies • Having reached >4.5E12 – back to studies at lower intensity • Studies still underway: • Apertures / Orbit Smoothing will continue – Kiyomi, Boosters • PreAcc/ Linac capture & acceleration tuning • Cogging software work continues • Booster optics software – Tan, Eliana -> streamlining and documenting • Booster RF cavity rework • Cavity from RF15 – high power tested and being installed today L22 • Cavity did have some issues – tuners running warmer than normal, some sparking but want to proceed with Refurb….. • Cavity RF3 from L14 was shipped to MI60 to start the refurb process • Booster RF17 from L19 being pulled and will let cool • Spare Cavity Work – leak checked good…next step to furnace weld end pieces then mate with corona rings. • Booster Ferrites • Delivery by 2nd or 3rd week of July – Vendor hope to have order completed by end of July. • High mu cores – testing small batch last week – not work on outcome • HLRF – New PO up on Director’s desk! Hope to have signed this week and then to purchasing. • Linac Modulator – no news – testing • Booster Shielding – We are finishing up the write-up….plan is to have a meeting and then submit report to ES&H • Booster Transverse/Longitudinal dampers – Higher intensity allowed tune-up but need to proceed with new hardware • MI Startup: Date set for July 3rd ? Startup comments (Fernanda, Todd)

  4. Spare Cavity New RFQ trim Booster ~4E12 Efficiency ~ 91% New RFQ trim installed

  5. Upcoming Talks Future Meetings to be Scheduled: • Bill Pellico - Loss Test Scans for Shielding Assessment • John Reid - Solid State Installation - Final Report • Kiymoi – Booster cogging plans • Eddy – Booster damper plans • Tan – RFQ Summary (after install of corrector and source B operating)

  6. Upcoming • Reports • Update of PIP Design Report – Yearly update work • PMG – some time next month…. • Budget Issues – Submitted FY14 labor and Budget • Labor given to other divisions • Will soon need to work with department heads to firm up names • PIP 11 M FY14 budget given to Ann • Please use the E-Log to put general work in progress updates/photos – weekly would be nice – if progress is being made in task • Need to post

  7. PIP Budget and Labor FY14 • PIP Budget Plan submitted last week to AD/Lab • 11 Million • PIP Labor requests/needs submitted last week • Ann forwarded to other divisions • Ann forwarded to AD departments • ~26 FTEs

  8. Example of worksheet table – broken out by Task

  9. PIP Budget FY14 Current OLD December

More Related