An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PIP Update Nov 28th 2012

  2. Agenda • Summary Update • Current Activities Updates/Talks: • Ken Domann - Project Status & Updates • Bob Zwaska - University Collaboration with PIP

  3. Update General Info • Current Work • Booster RF cavity rework – Two cavities waiting (1&3) – 3 is at MI-60 • Tuner Work – Working on completing a group of cones (done this week)Three tuners ready for installation before the Christmas. The plan is to pull a tuner in a couple of weeks. • LCW – Jobs remaining: MP02/DOG re-hosing, repair L5 choke LCW manifold, repair leak at L1-2 manifold, replace "Y" strainer valves leaking (7), re-hose reference magnet • RFQ – Beam down to NTF, Intensity at about 23ma, Efficiency about 88% • Visit BNL, Work on Steering, Work on E-Lens, Work on Buncher, RFQ low level ctrl. • HPowerNO word yet but rumor has it that we will not get lost $$ • Booster Absorber – Kicker and PS work continues – One steel block was modified and will be delivered this week. • Linac Modulator – EE support has built a small test setup - • Booster SS: All but RF17 in, RF 9 tested, DCC’s need testing, PA’s need to be mounted in West Gallery, Fanback system needs calibration: ALL BY Jan 1st • Booster Modulator work – shipping two on Friday, Two on Wed., 3 after the following week. The goals for 17 stations for startup. • Cogging – Software work continues • Booster Shielding – Safety meeting today to go over current status Shutdown - comments (Fernanda, Todd, Mary) End of Fiscal Year – Not much change – There is still some FY12 –> FY13 funding discussions occurring

  4. Upcoming • RLS – updates went out yesterday • (Elmie is gone but not forgotten – Ken is now the controls person) • Reports (upcoming) • Reid on “lessons learned” Booster Cavity Refurbishment • PIP talk at PAC • PAC released their recommendations on Monday – • Visit web site for details but MiniBooNE was not given a recommendation to continue to run – not helpful for Booster commissioning.

  5. Upcoming Talks Future Meetings: • December 5: • Jon Reid - Collected results from first four cavity refurbishments, new-ferrite tuner, potential stem interface modifications, and cavity 1013 CY Tan - RFQ Installation and Startup Plans (TBC) Fernanda Garcia - Linac Startup Plans • December 12: • Todd Sullivan - Booster Startup Plans • To be scheduled: • Alex Macridin - Simulations of Transverse Instabilities Dan Wolff - Linac Modulator Prototyping. • Dave Hixson - Booster LCW Upgrades Final Report