auryon
Uploaded by
20 SLIDES
1398 VUES
370LIKES

Work Breakdown Structures And Linear Responsibility Charts

DESCRIPTION

Work Breakdown Structures And Linear Responsibility Charts (Session 2 in the Project Planning And Management Module) Russ Pimmel Electrical and Computer Engineering University of Alabama October, 2001

1 / 20

Télécharger la présentation

Work Breakdown Structures And Linear Responsibility Charts

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Work Breakdown Structures And Linear Responsibility Charts (Session 2 in the Project Planning And Management Module) Russ PimmelElectrical and Computer Engineering University of Alabama October, 2001 The development of this material was supported by a grant from the Engineering Education Program of the National Science Foundation under award EEC-9802942 to the Foundation Coalition

  2. Review of Session 1 • Concept of a project • Importance of project planning & management in modern industry • Planning and monitoring the 3 S’s • Scope (goals and performance) • Spending (budget and resources) • Scheduling (project and task time constraints) • Tools for planning and monitoring • Work breakdown structure • Linear responsibility chart • Activity networks • Gantt charts • Budgets • Percent completion matrix

  3. Learning Objectives Session 2 • Students should be able to define, describe, and use • Work breakdown structure • Linear responsibility chart

  4. Work Breakdown Structure

  5. Work Breakdown Structure (WBS) • Primary tool for determining scope of work • Identify a set of top-level tasks • These are broken down into subtasks • Continue in a hierarchical manner • Decompose complicated task into “manageable tasks” • “Manageable task” – estimate its time and resource requirements

  6. WBS Requirements • A WBS must • Account for all activities that consume time or resources • Contain enough detail to accurately estimate • Completion time of each task • Resources needed for each task

  7. What a WBS Is Not • WBS is not • An org-chart Does not show roles people play • A schedule • Does not show task start and completion dates • A flow chart • Does not show the temporal or dependent relationships among tasks • A listing of the skills needed to complete the task

  8. WBS Heuristics • If you can not estimate the time or resources (including manpower) required to compete a task, break it down further

  9. WBS Formats • Tabular format -- resembles an outline with major tasks at first level and subtask listed under each in hierarchical fashion • Graphical format -- hierarchical block diagram with major task blocks at top level and subtask blocks for each connected to them

  10. WBS Example – Preparing A Meal • You want to prepare a special dinner consisting of a special soup and a baked chicken entrée. You have only two pots and one frying pan. The soup must boil for 35 minutes, and you should allow 15 minutes to serve and consume it. The chicken dish requires a fair amount of preparation: you have to boil the rice for 30 minutes, brown the chicken in a frying pan for 15 minutes, and place the rice and chicken with its sauce in the oven 15 minutes. It takes 5 minutes to make the sauce in the frying pan and 15 minutes to boil the peas. You have to allow 5 minutes to uncork the wine and 30 minutes to let it breath before serving. You plan to allow 25 minutes to serve and consume the meal. How long will it take to prepare and eat the meal?

  11. WBS Example – Preparing A Meal – 1st Step • Prepare meal • Eat entrée

  12. WBS Example – Preparing A Meal – 2nd Step 1.0 Prepare meal 1.1 Cook Soup 1.2 Cook chicken, rice, and sauce 1.3 Boil peas 1.4 Open wine and let it breathe 2.0 Eat meal 2.1 Eat Soup 2.2 Eat Entrée _______________________ Frequently task are numbered using hierarchical decimal format

  13. WBS Example – Preparing A Meal – 3rd Step 1.0 Prepare meal 1.1 Cook soup 1.2 Cook chicken, rice, and sauce 1.2.1 Boil rice 1.2.2 Brown chicken 1.2.3 Prepare sauce 1.2.4 Bake chicken, rice, and sauce 1.3 Boil peas 1.4 Open wine and let it breathe 1.4.1Open wine 1.4.2 Wine breathe 2.0 Eat meal 2.1 Eat soup 2.2 Eat entrée

  14. Prepare meal Eat meal Eat soup Cook soup Boil peas Eat entrée Prepare wine Cook chicken dish Open wine Boil rice Breathe wine Bake chicken dish Brown chicken Prepare sauce WBS Example – Preparing A Meal – Graphical Representation

  15. Team Exercise Work Breakdown Structure (WBS) • Task -- Construct a WBS for an assigned problem • Recall • Planning the project not completing it • Hierarchical structure of WBS • Process -- Work as a team • Individual brainstorming (2 minutes) • Building consensus (5 minutes) • Reporting results (2 minutes) • Randomly selected individuals report team’s WBS

  16. Linear Responsibility Chart

  17. Linear Responsibility Chart (LRC) • Structure • Row for each task • Column for each participant • Indicates type of responsibility (primary, consulting, reviewing, etc.) for each task • Who is responsible • Who is involved

  18. Use Of LRC • Provides structure for identifying and sharing responsibility • Allows team to reach consensus on who is doing what • Let’s all stakeholders understand their responsibilities • Translate the “what” of the WBS into the “who” of responsibility

  19. Questionable LRC Forms • Every team member involved in every task • Team leader responsible for every task

  20. Team Exercise Linear Responsibility Chart • Task -- Construct a LRC for an assigned problem Use the WBS developed earlier • Process -- Work as a team • Individual brainstorming (2 minutes) • Building consensus (5 minutes) • Reporting results (2 minutes) • Randomly selected individuals report team’s WBS

More Related
SlideServe
Audio
Live Player
Audio Wave
Play slide audio to activate visualizer