An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Environmental Compliance Issues Kenya Stump Compliance Assistance Coordinator

  2. Agenda • Overview of the NESHAP (Subpart 6H): Paint Stripping and Misc. Surface Coating • Other Environmental Issues • Northern KY Issues-Maria Schmitt • HVLP Spray Guns

  3. Subpart 6H • Why these categories? • Affected sources and activities • Compliance due date • Requirements • Recordkeeping • Notification and Reporting

  4. Background NESHAP: Paint Stripping and Miscellaneous Surface Coating Operations at Area Sources published 1/9/08 (73 FR 1738) Area Sources - federal Hazardous Air Pollutant (HAP) emissions less than 10 tons per year (TPY) of any one and less than 25 TPY of all combined 4

  5. July 19, 1999 Urban Air Toxics Strategy EPA required to list 30 HAPs from area sources which pose the greatest potential public health threat in urban areas EPA must regulate area source categories accounting for 90 percent of the emissions of 30 listed HAPs EPA listed 70 area source categories, including autobody refinishing operations, paint stripping operations and plastic parts and products surface coating 5

  6. Initial categories listed did not sufficiently cover six metal HAPs • Autobody refinishing operations, plastic parts and products surface coating (which included SICs for products also made of metal) were included to address the metal HAPs

  7. Affected Sources • affected operations at area sources • federal HAP emissions less than 10 tons per year (TPY) of any one and less than 25 TPY of all combined • three affected operations • 1: paint stripping operations involving use of Methylene Chloride (MeCl) to remove dried paint • from wood, metal, plastic or other substrates

  8. 2: motor vehicle and mobile equipment spray-applied surface coating operations • includes mobile repair operations • includes individuals coating more than 2 vehicles or mobile equipment in a year, whether or not compensated • 3: spray application of coatings containing Cr, Pb, Mn, Ni, or Cd (target HAPs) to any metal or plastic parts or products that are not motor vehicles or mobile equipment

  9. Sources NOT Affected • Armed Forces, NASA, or National Nuclear Security Administration operations performing affected activities • affected activities performed on military munitions or equipment for use by Armed Forces • affected activities performed by individuals on personal vehicles, possessions, or property as a hobby or maintenance, or done by individuals for others without compensation

  10. research and laboratory activities • quality control activities • activities covered under any other area source NESHAP • motor vehicle and mobile equipment spray-applied surface coating operations that successfully petition EPA for exemption, demonstrating that no target HAPs are used in any coatings

  11. Activities Included • Any one of the following: • mixing rooms and equipment • spray booths, ventilated prep stations, curing ovens and associated equipment • spray guns and associated equipment • spray gun cleaning equipment • equipment used for storage, handling, recovery, or recycling of cleaning solvent or waste paint • equipment used for paint stripping at paint stripping facilities using strippers that contain MeCl

  12. Activities NOT Included • spray-applied applications: • using hand held device with a cup capacity no more than 3.0 fluid ounces (89 cc) • powder coating • Hand held, non refillable aerosol containers • non-atomizing technology • brushes, rollers, hand wiping • coating techniques – flow, dip, electrodeposition, web, coil • Touch-up markers or marking pens • thermal spray operations using solid metallic or non-metallic materials

  13. Activities NOT Included • affected coatings do not include: • decorative, protective, or functional materials that consist only of protective oils for metal, acids, bases, or any combination • paper film or plastic film that may be pre-coated with adhesive • adhesives, sealants, maskants, or caulking materials • temporary protective coatings, lubricants, or surface preparation materials • in-mold coatings that are spray-applied in the manufacture of reinforced plastic composite parts

  14. Am I a New Source? • new sources • began construction of source after September 17, 2007 • except for construction of new paint booths, enclosed spray gun cleaners, paint stripping equipment to reduce MeCl emissions, or spray guns to comply with the rule • include any new affected equipment where the source was not previously engaged in the activity

  15. When Do I Have to Comply? • New sources by January 9, 2008, or whenever you start operating the new equipment • Existing sources have three years from January 9, 2008

  16. Requirements for Paint Stripping • minimize emissions of MeCl using the following management practices • evaluate each application for need to remove paint (e.g. can part be recoated) • evaluate each application for alternative to MeCl • reduce exposure of MeCl strippers to air • optimize conditions when using MeCl to reduce evaporation (e.g., if heating, use lowest possible temperature) • use proper storage and disposal techniques

  17. Requirements for Paint Stripping • if operation uses more than one ton of MeCl in a year • develop and implement a written MeCl minimization plan • post the plan in areas where activity occurs • if operation uses one ton of MeCl or less • no written plan is required, but must comply with minimization management practices

  18. Requirements for Motor Vehicle, Mobile Equipment and Misc Surface Coating • 1: painters must be certified as completing training in proper spray application of surface coatings, setup and maintenance of spray equipment • except students of accredited surface coating training program who are under the direct supervision of an instructor who is certified

  19. Requirements for Motor Vehicle, Mobile Equipment and Misc Surface Coating • 2: spray-applied coatings must be applied in spray booth, preparation station, or mobile enclosure that meets a and b, c or d: • a: fitted with filter system demonstrated to have 98% collection efficiency, using vendor provided test data, or using waterwash spray booths operated to manufacturer’s specs • b: booths and prep stations for complete motor vehicles or mobile equipment must • have full roof and four walls or side curtains, and operate at negative pressure; OR • use downdraft booth operated at up to, but no more than, 0.05 inches w.g. positive pressure

  20. Requirements for Motor Vehicle, Mobile Equipment and Misc Surface Coating • 2: spray booths, prep stations, or mobile enclosures • c: booths or prep stations for miscellaneous coating or vehicle subassemblies • have full roof, at least 3 complete walls or side curtains, and ventilated so air is drawn into the booth • roof and walls may have openings for conveyors • d: mobile enclosures for spot repairs must enclose and seal against the surface being coated and are retained in enclosure and directed to the filter

  21. Requirements for Motor Vehicle, Mobile Equipment and Misc Surface Coating • 3: spray-applied coatings must be applied with one of the following gun technologies: • high volume, low pressure (HVLP) • electrostatic • airless • air-assisted airless • with written approval from EPA, other spray technology demonstrated to achieve equivalent transfer efficiency

  22. Requirements for Motor Vehicle, Mobile Equipment and Misc Surface Coating • 3: listed spray technologies are not required if: • painting is performed by students and instructors at paint training centers • coating aerospace vehicle • components that normally require use of airbrush or extensions to reach limited access areas • with coatings that contain fillers that adversely affect atomization with HVLP • with coatings that have dried film thickness of less than 0.0013 cm (0.0005 in)

  23. Requirements for Motor Vehicle, Mobile Equipment and Misc Surface Coating • 4: spray gun cleaning operation should prevent atomized mist or avoid spraying cleaning solvent and paint residue outside container used to collect waste solvent • acceptable options include: • hand cleaning of disassembled gun • flush gun with solvent, without spraying • use fully enclosed gun cleaner • combination of non-atomizing methods

  24. Requirements for Motor Vehicle, Mobile Equipment and Misc Surface Coating • train all personnel, including contractors, who spray apply coatings • initial training • within 180 days of starting date or January 9, 2008, whichever is later • existing personnel can use training that took place up to five years prior to the “180 days” date required for initial training, if it met elements of training program required in the rule • refresher training, at least once every five years following initial training date

  25. Requirements for Motor Vehicle, Mobile Equipment and Misc Surface Coating • training program must include: • spray gun equipment selection, set up, and operation (measuring viscosity, selecting proper tip or nozzle, proper spray pattern, air pressure and volume, and fluid delivery rate • best spray technique for different types of coatings to improve transfer efficiency and minimize overspray (spray gun distance and angle to the part, proper banding and overlap, reducing lead and lag spraying) • routine booth and filter maintenance, filter selection and installation • compliance with requirements of the NESHAP

  26. Requirements for Motor Vehicle, Mobile Equipment and Misc Surface Coating • owner or operator must certify training of each person was completed: • list of personnel who are required to be trained, with name and job description • hands-on and classroom instruction, covering elements of training program at a minimum • description of methods used at completion of initial or refresher training to demonstrate successful completion

  27. Recordkeeping • Paint stripping • list of the materials used that contain MeCl, including their MeCl content (from MSDS or other supplier documentation sufficient), and information to determine usage of MeCl (purchase receipts, supplier data, calculations, etc.) • copy of minimization plan kept on site, if using more than one ton of MeCl in calendar year • including annual review and updates to plan • records of any deviations from requirements in the rule, including date and time period it occurred, a description of deviation, and corrective actions taken

  28. Recordkeeping • Surface coating • painter training certification • documentation of filter efficiency • if spray gun does not meet definition of acceptable technologies and has cup capacity at least 3.0 oz, documentation from spray gun manufacturer that Administrator has determined equivalent transfer efficiency • copies of all notifications and reports required • records of any deviations from requirements in the rule, including date and time period it occurred, a description of deviation, and corrective actions taken

  29. Notification and Reporting • Initial Notification • new sources must submit no later than 180 days after start up, or 180 days after January 9, 2008 whichever is later • existing sources must submit no later than 2 years after January 9, 2008

  30. Notification and Reporting • Initial Notification includes: • company name • owner/operator name, title, street address, phone, email (if available), and signature • street address for location of compliance records, if different from source • identify NESHAP: 40 CFR part 63, subpart HHHHHH • description of operations • motor vehicle or mobile equipment, or miscellaneous surface coating; number of prep stations and paint booths; number of painters employed • paint stripping operation; methods of paint stripping employed; substrates stripped

  31. Notification and Reporting • Initial Notification (continued) • compliance • paint strippers must indicate whether more than one ton of MeCl will be used after compliance due date • statement of whether source is in compliance or will be brought into compliance by compliance due date • for new sources, initial notification is the notification of compliance status • for existing sources, initial notification MAY be used as notification of compliance status if already in compliance and avoid the second notification

  32. Notification and Reporting • Notification of Compliance Status • existing sources not able to demonstrate compliance in the initial notification must submit this notification 3 years from January 9, 2008 plus 60 days • include same basic information as initial notification • indicate date of compliance with all relevant requirements • paint stripping sources using more than one ton of MeCl in a year must certify they have written and are implementing their minimization plan

  33. Notification and Reporting • Notification of Changes Report • instead of requiring annual certification of compliance, sources must submit an updated certification if their compliance status changed during the previous year • notification is due on the date of the anniversary of the date of the last submittal, whether it was the initial notification, notification of compliance status, or a previous annual notification of changes report • changes include paint stripping sources that increase usage of MeCl to more than one ton in a calendar year • submit the changes report by March 1 following the year usage went over one ton of MeCl • develop and implement a written minimization plan by December 31 • submit a notification of compliance status by March 1 of the following year

  34. Stay Tuned For • Development of Initial Notification and Compliance Forms • Implementation Tools and FAQs

  35. Other Environmental Issues • Hazardous Waste • Paint Filters-Proper waste determination • Rags-Proper waste determination • Solvent Recyclers • Used oil burners • Universal Waste • Spent Lamps • Water Issues • Direct Discharges • Stormwater Construction • Groundwater Protection Plans • Emergency Response • Reportable quantities are 25 gallons or more of a petroleum product within a 24-hour period and 75 gallons or more of diesel fuel in a 24-hour period or any amount that creates a visible sheen on surface waters. (KRS 224 01-400) • 502-564-2380 or 1-800-928-2380 • Underground Storage Tanks • Aboveground Storage Tanks

  36. Other Environmental Issues • Air Quality • Northern Kentucky • Solvent metal cleaning equipment • Miscellaneous metal parts and products surface coating • Commercial motor vehicle and mobile equipment refinishing

  37. Resources • Division for Air Quality www.air.ky.gov • Division of Waste Management www.waste.ky.gov • Division of Water www.water.ky.gov • Emergency Management http://www.dep.ky.gov/enviroemergencies/

  38. Contact Us Division of Compliance Assistance 300 Fair Oaks Lane Frankfort, KY 40601 800-926-8111 www.dca.ky.gov envhelp@ky.gov