Comprehensive Planning for 10 MWp Building-Integrated Photovoltaic Systems in Kansas
90 likes | 232 Vues
This document outlines the planning and production framework for a 10 MWp building-integrated photovoltaic (BI-PV) project in Kansas. It covers yearly production metrics, distributed generation strategies, and critical infrastructure protection through cyber security standards and emergency management systems. The project emphasizes fuel-free, non-polluting energy sources and outlines long-term reliability contracts for hospitals, schools, and other critical facilities. The goal is to ensure sustainable energy solutions that enhance community resilience and energy security.
Comprehensive Planning for 10 MWp Building-Integrated Photovoltaic Systems in Kansas
E N D
Presentation Transcript
KANSASSOLAR ELECTRIC CO~OPERATIVES TEN 10 MWp Yearly Production Building-Integrated Photovoltaic Manufacturing Museums BI-PV MM
Southwest Power Pool Distributed Generation Planning • Critical Infrastructure Protection Working Group [CIPWG] Distributed Generation [DG] • CIP-002-1 Critical Cyber DG BI-PV [1302] • Modified Criteria to Include Fuel-Free Non-Polluting Distributed Generation [DG] • CIP-003-1 Security Mmgt Controls [1301] • Critical Positioning Distributed Generation [DG] • Hospitals ~ Security Zones ~ Schools
CYBER SECURITY STANDARDS CIP-002-1 Critical Cyber DG CIP-003-1 DG Security Mgmt CIP-004-1 Personnel Training CIP-005-1 Electric Security CIP-006-1 Physical Security CIP-007-1 DG Security Mgmt CIP-008-1Incident Report Mgt CIP-009-1 Recovery Plans CIP-010-1 DG Interconnection Standards w/BI-PV EMS Planning DISTRIBUTED GENERATION [DG] BI-PV DG 30-Year Reliability Contracts BI-PV DG Local Security EE Management BI-PV DG Staff Familiarity/Expertise BI-PV DG Critical EMS Mgmt for Hospitals BI-PV DG Strategic EMS Schools ~ Govt. BI-PV DG EMS 10% for Every Community BI-PV DG Back-up Redirect Exercises BI-PV DG Recovery Resource Planning BI-PV DG Long-term Assurance Contracts BI-PV DG EMS Solar Electric Cooperatives Production, Installation & Grid Management Southwest Power Pool Distributed Generation Planning
450 MWp BI-PV DG Installed Capacity by 2010 YEAR |10 MWp Plants|BI-PV@12.5WSF|Manufacturing | Museums
450 MWp BI-PV DG Production Expenses by 2010 YEAR|CONST MATERIALS BOS LABOR TOTAL $.50 Wp $.25 Wp $.25 Wp $1 Wp
450 MWp BI-PV DG Total Expense to 2042 YEAR PROD 1$Wp INSTALLATION 35-yr Warranty $ INVESTMT
450 MWp BI-PV DG Installed Electric Valuation to 2010 YEAR 4.5SUNHRS=MWh YRLY MWh $GEN @$50MWh CUM $GEN
2,500 MWp BI-PV DG Installed Electric Valuation by 2036 CUM EXP GEN$M@$50MWh 450 MWp FIVE YEARS $1.50 Wp=$M 500 MWp=GWh GEN CUM $M GEN CUM $M
RATIO 2,500 MWp=GWh 450 MWpYEARS $12B DEBT/INC GEN$B@$50MWh GEN CUM $B GEN CUM $M