1 / 9

Objective ITY-AGDL

Objective ITY-AGDL. ESSIP Plan 2013. Adriatik KOKONA DSS/EIPR 13.09.2013. Comprehensive Explanation (1/3). This OBJ covers the implementation of initial data link services based on air-ground (ATCO  Pilot) point-to-point data communications as specified by Regulation

boyce
Télécharger la présentation

Objective ITY-AGDL

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Objective ITY-AGDL ESSIP Plan 2013 Adriatik KOKONA DSS/EIPR 13.09.2013

  2. Comprehensive Explanation (1/3) • This OBJ covers the implementation of initial datalink services based on air-ground (ATCO  Pilot) point-to-point data communications as specified by Regulation • 29/2009 EC (data link services). • Scope: EU+ States = EU+CH+NO+ECAA • MIL: not applicable (only 1 non-mandatory SLoA on State a/c equipage) ESSIP Plan 2013 / Objective ITY-AGDL

  3. Comprehensive Explanation (2/3)(=> Mandatory REG and ASP related SLoAs) ESSIP Plan 2013 / Objective ITY-AGDL

  4. Comprehensive Explanation (3/3)(=> Non-mandatory SLoAs) ESSIP Plan 2013 / Objective ITY-AGDL

  5. Link to European ATM Master Plan • [AUO-0301] - Voice Controller-Pilot Communications (En Route) Complemented by Data Link ESSIP Plan 2013 / Objective ITY-AGDL

  6. Finalisation Criteria and Closed Questions • Various – see detailed breakdown in ESSIP Plan 2013. ESSIP Plan 2013 / Objective ITY-AGDL

  7. Supporting Material • Various – see ESSIP Plan 2013 ESSIP Plan 2013 / Objective ITY-AGDL

  8. ESSIP Report 2012 • The overall progress can be considered not satisfactory for the states, the airspace of which belongs to the Part A of the Annex I of the Regulation (EC) No 29/2009, with the regulated completion deadline 02/2013. None of these states will manage to achieve the deadline, while from the ANSPs perspective, only DFS and MAS has completed all their actions. Most of the states, the airspace of which belongs to Part B, with regulated completion deadline 02/2015, and ECAA States, have planned to implement the objective, within the deadline, except Six states which have not developed any plans.; • 2 States have reported the objective Partially Completed, 23 planned to complete the objective within the ESSIP deadlines while 4 States have reported it Late. 6 States reported not yet plans developed for implementation. ESSIP Plan 2013 / Objective ITY-AGDL

  9. Links and contacts • Objective Coordinator: Adriatik Kokona, +32 2 729 3556 adriatik.kokona@eurocontrol.int • DSS Objective Expert(s): Eivan Cerasi, +32 2 729 3791 eivan.cerasi@eurocontrol.int • DNM Objective Expert(s): Soren Dissing , +32 2 729 3446 soren.dissing@eurocontrol.int ESSIP Plan 2013 / Objective ITY-AGDL

More Related