70 likes | 179 Vues
This meeting covers the agenda focusing on safety, setup status, and the schedule at the RHIC. Key updates include the completion of the Dry Run 08, installation of new JET silicon detectors, and scheduled work on the Booster Transformer Switch. Reports from RHIC experiments, including contributions from team leads such as Kip Gardner for RHIC itself, Bill Christie for STAR, and Mike Leitch for PHENIX, among others, highlight ongoing research activities. Additional system reports on cryogenics, vacuum, power, and more are also shared.
E N D
Time Meeting: Agenda • Safety • Setup Status and Schedule • RHIC and Experiments Reports • Machine and Systems Reports • AOB
Safety • Take 5 for Safety…………..Ed Lessard
Since we last met: • Dry Run 08 completed. • New JET silicon detectors installed. • Booster Transformer Switch work for LIPA scheduled for 1 November 2007 7AM-7PM. • LHe delivery schedule set.
RHIC and Experiments Reports • RHIC………………………….…….Kip Gardner • STAR......................................Bill Christie • PHENIX.................................Mike Leitch • Polarimeter…………………….Haixin Huang • MonoPole….............Vasily Dzhordzhadze • NSRL....................................Adam Rusek • BLIP…………………….…..Leonard Mausner • APEX......................................Fulvia Pilat
Machine Reports • Operations……………...Peter Ingrassia • Sources...............................Jim Alessi • Linac and Tandem...............Jim Alessi • Booster and AGS...............Leif Ahrens • Maintenance………….…Paul Sampson • Beam Lines…………………..Al Pendzick • Beam Comp/Instrum..……..Tom Russo
Systems Reports • Cryogenics.............Andy Warkentien • Vacuum..........................Mike Mapes • Power………………………Jon Sandberg • RF................................Alex Zaltsman • Controls...........................John Morris • Access Controls……….Jonathan Reich • RCF…………………………...Tom Throwe