An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The ANTARES Data Acquisition System S. Anvar, F. Druillole, H. Le Provost, F. Louis, B. Vallage (CEA) ACTAR Workshop, 2008 June 10

  2. The ANTARES detector http://antares.in2p3.fr

  3. Acquisition nodes Slow-control Data Clock Energy The "0.1 km2«  project Offshore Onshore Electromechanical cable Processing nodes • 12 detection lines (400 m) • 300 acquisition nodes (25 / line) • 900 photomultipliers (3 / node) • 1800 data sources @ 20 Mb/s max • System spread over 30000000 m3 @2500 m depth • Onshore Farm of 80 processing nodes Line Control photomultiplier Junction box Electro-optical cable

  4. ANTARES Sector Line

  5. ANTARES Line deployment (1)

  6. ANTARES Line deployment (2)

  7. Photomultipliers counting rates kHz kHz seconds bioluminescence burst (April 2003)* High fluctuations in counting rates days Base line (April 2003)* *data published on the ANTARES site http://antares.in2p3.fr

  8. The Photomultiplier signal processing 1 Single Photon Electron (SPE) : Charge/Time stamp = 6 bytes 1 full waveform (Anode): Anode + clock samples = 263 bytes • Waveform used for detector calibration / PM signal analysis (very useful) • On line trigger (Neutrino track finder) only uses SPE events. • Detector operates in SPE mode • ~ 10 Mb/s per PM in average • *900 PM = ~9 Gb/s for the full detector ARS ASIC : Analog Ring Sampler

  9. Offshore: on-board system • Thermal dissipation (titanium container) • Limited room (~15 boards of 12 cm ) • Limited electrical power (~35 W / storey) • Very limited access (1  / 3 years) • Numerous modules: MTBF problem( 400 spatial « satellites »)

  10. LCM LCM LCM MLCM LCM SCM Shore station Junction Box Detector readout : an Ethernet network Responsibilities : IN2P3 : Slow-control/data base CEA : Sub-marines data NIKHEF : Data wavelength multiplexing For each sector (DWDM) NIKHEF : Run control/on shore acquisition Ethernet 100 Mb/s (1 fibre WDM/45 m max) Data Slow control Ethernet 1 Gb/s (2 fibres DWDM/330 m max) Processor board 60x Ethernet 1 Gb/s 12x Ethernet 100 Mb/s (24 fibres DWDM/40 Km) 5 Sectors Switch board LCM ; Local Control Module 5x Ethernet 1 Gb/s 1x Ethernet 100 Mb/s (2 fibres DWDM/100 m) 12 Lines MLCM ; Master LCM SCM : String control Module A separate proprietary Network to time stamp the PM signals (1 ns precision)

  11. Processor (Motorola MPC860P@80MHz) Boot / Local File System RTOS Slow Control Task Slow Control Flash Memory (4 MB) SDRAM Memory(64 MB) Slow control for the storey Ethernet Link 100Mb/s To Shore station Offshore Acquisition nodeA dedicated processor board Data from the storey(ASIC ARS) Programmable Logic FPGA Data Data Task

  12. LCM data/slow control processing ARS data Dynamic Memory Logic Device (FPGA) 1/Status 2/RAZ Time 3/Counters 4/SPE 5/Anode Waveform 6/Anode Waveform +Dynode Counters ARS 0 SPE ARS 0 ARS 1 Anode Waveform ARS 2 Buffers Multiplexor ARS 3 Counters ARS 4 ARS 5 ARS 1 104 ms Clock Experiment Periodic Slow control/on demand/configuration 100 Mb/s Ethernet Port Slow Control object 104 ms Data 104 ms Data Processor To shore PC 1 To shore PC 2

  13. Offshore Processor board • Power 4W full charge • TCP/IP Network throughput • Running Linux/MontaVista : 25 Mb/s • Running vxWorks/windRiver : 30 Mb/s, 50 Mb/s With « Zero Copy Buffer » option • Operational Configuration • Selected RTOS vxWorks • No DAQ performances drop due to slow-control • Measured data rate : 50 Mb/s

  14. Off-shore : robustness/hardware frozen Ethernet switch routing Global DAQ Architecture • Off-shore : • 300 Detection nodes • No trigger / All data to shore • Nodes synchronised by a global clock (Physics event time stamp) • Each node send 104 ms of data to the same On-shore processing node On-shore : Processing power/upgradable • On-shore : • 80 Processing nodes • Each node treat a full 104 ms detector view. Neutrino Track finding. • Full software trigger

  15. On-line Trigger principle • No dead time • “Self triggered” SPE signals send to shore • All data send to shore. No hardware trigger (local storey level1 trigger implemented but not used) • High fluctuations (bioluminescence) absorbed in the front end processor board  Max storey rates: 120 Mb/s • High Rate Veto applied to a PM, typically 400 kHz

  16. LCM LCM LCM LCM LCM Network topology LCM LCM LCM LCM LCM ~21 Mb/s SECTOR SWITCH (in: 5x100, out: 1x1000) SECTOR SWITCH (in: 5x100, out: 1x1000) Used as data concentratormultiples input ports  one single output port  congestion risk  intelligent control ON-SHORE SWITCH: (in: 60x1000, out: 100x1000) PC PC PC PC PC PC PC

  17. Acquisition Data flow High rate Veto @400 kHz PM x3 Offshore processor x5 50 M bit/s max Off shore Ethernet Switch x60 Offshore 250 M bit/s max Onshore Ethernet Backbone x1 Data Filter x80 Counting rate (12 G Bytes/day) Offline : ~3 ascending Neutrino/day 10 Hz Neutrino Candidates (2,6 G Bytes/day)

  18. Conclusion • No hardware trigger. All Data to shore concept (pushed by NIKHEF/DWDM) • Offshore system fully configurable from shore (firmware, software, RTOS image) • Onshore trigger fully upgradable • Concept is working fine. 12 lines currently operating by 2500 m depth. • Development time not reduced because software development and debugging may be as time consuming as hardware.