SlideServe
Menu
Préférences
© SlideServe · v2026

Activated sludge settling problem resolved

cahil avatar
22 diapositives · 495 Views · Jul 19, 2014

Activated sludge settling problem resolved. Al Parrella Western Lake Superior Sanitary District. Typical SVI values. 65-70 range (annual average). SVI values December-February (2012-2013). SVI values December-February (2012-2013). Trouble above this line. Problems in plant.

Activated sludge settling problem resolved - slide 1
01 / 22Activated sludge settling problem resolved
1 / 17

Télécharger la présentation

Activated sludge settling problem resolved
Une image / un lien ci-dessous est fourni (tel quel) pour télécharger la présentation

Politique de téléchargement : le contenu du site vous est fourni TEL QUEL pour votre information et votre usage personnel ; il ne peut être vendu, concédé sous licence ni partagé sur d’autres sites sans l’accord de son auteur.Le contenu vous est fourni TEL QUEL, pour votre information et votre usage personnel uniquement. Téléchargez la présentation en cliquant sur ce lien. Lors du téléchargement, si vous ne parvenez pas à télécharger une présentation, l’éditeur a peut-être supprimé le fichier de son serveur.Pendant le téléchargement, si vous ne parvenez pas à obtenir une présentation, le fichier a peut-être été supprimé par l’éditeur.

F I N

Plus de contenu associé

Transcription de la présentation
  1. Activated sludge settling problem resolved Al Parrella Western Lake Superior Sanitary District

  2. Typical SVI values • 65-70 range (annual average)

  3. SVI values December-February (2012-2013)

  4. SVI values December-February (2012-2013) Trouble above this line

  5. Problems in plant • High sludge blanket levels • Thin sludge • Appearance of settleometer • Other indicators to follow:

  6. Return sludge solids concentration

  7. Thickened sludge solids concentration (sludge sent to digestion)

  8. Operating parameters, centrifuges

  9. Operating parameters, centrifuges Problem

  10. What started it all? • Problem with dewatering centrifuge polymer system • Common to both centrifuges • Corrected early January

  11. SVI values December-February (2012-2013) Mechanical problem repaired here

  12. SVI values December-February (2012-2013) Mechanical problem repaired here Activated sludge process adjustment made here

  13. Initial response to problem • As plant became upset with recycled digested sludge, response was to increase the aeration units in service • This may have been proper to address the amount recycled septic sludge entering the aeration system but caused a classic “low nutrient” problem when the recycle flow stopped

  14. My point: • Even though mechanical problem was resolved in early January we still had deteriorating activated sludge problem because we had too many aeration units in service!

  15. Adjustment made to number of Unox reactors in service

  16. Result of taking reactor off line • BOD was driven deeper into the basins • F/M increased (by roughly 25%) • Sludge regained its darker-brown color • SVI came within range and settling improved in the nick of time (before the spring floods)

  17. Through it all • Only effluent limit that we struggled with was phosphorus • But we met all limits