1 / 9

Arpad Szomoru, JIVE

e-EVN update. Arpad Szomoru, JIVE. Topics. Some recent firsts Technical developments New science Yet to come. Firsts in this period. e-fringes to Yebes, Urumqi, Kashima, Westford, Hobart 1024 Mbps observations with Ef, Wb, Tr, On, Jb e-fringes on mark5B (at correlator)

caleb-bauer
Télécharger la présentation

Arpad Szomoru, JIVE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. e-EVN update Arpad Szomoru, JIVE

  2. Topics • Some recent firsts • Technical developments • New science • Yet to come

  3. Firsts in this period • e-fringes to Yebes, Urumqi, Kashima, Westford, Hobart • 1024 Mbps observations with Ef, Wb, Tr, On, Jb • e-fringes on mark5B (at correlator) • 33-hour (near) continuous observation • Merlincast, inclusion of multiple Merlin telescopes through multicast

  4. Beyond 1 Gbps • Wb, Ef, On, Tr • via 10G, bonding • Synergy w. eLOFAR • and now Jb • bonding on 2 international lightpaths • with Cm and Kn added in elliptical robin mode

  5. Real-time monitoring, adaptive scheduling • Real-time monitoring of station status • Fast diagnostics, essential for “non-expert” e-operations • Readily expandable to display any logged information • Adaptive scheduling: has been demonstrated to work • But technique remains in limbo

  6. Mark5B and e-VLBI • Locally developed jive5A control code used for Mk5A e-VLBI operations and for Mk5B e-transfers (on the Dimino side) • B-data played back on A+ units at correlator (both e- and non-e) • Haystack-developed Domino code adapted for use with EVN correlator • Buffering needed in Mk5A • First fringes between A and B (with playback on B) on May 13 • Mk5B I/O board unfortunately expects perfect data, completely stops in case of missing/corrupted headers • Workaround in place, being tested

  7. Latest e-VLBI science Compact SNRs in Arp299 PI: Miguel Angel Perez-Torres WSRT/e-EVN resolves the mystery of Hanny’s Voorwerp Jozsa, Rampadarath, Garrett et al. AGN activity SS433 in outburst, PI: V. Tudose

  8. e-VLBI at high redshift • Using e-VLBI to pre-select high-redshift sources • Few hours sufficient for detection Z = 4.61 Z = 5.3 Images from pypelined data: the e-EVN is a powerful, fast-response detection instrument

  9. (near) future • First JVN-EVN observations at 6.7 GHz, hopefully followed by an e-demo with Yamaguchi • More demand for EVN-Kashima baselines? • First test observations with KVN planned, telescopes will be connected at 10 Gbps this fall • 4 Gbps tests planned

More Related