An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RELAY PUMPING Task Force-7 Engine 14 Engine 13 Batt. 2

  2. Dual Pumping • In a dual pumping operation, two pumpers are connected intake to intake in order to take advantage of an excellent water source.

  3. Tandem Pumping • In tandem pumping, the engine connected to the supply source discharges water into the intake of the second engine.

  4. I. Definition: • The process of using two or more pumpers to move water through hoselines over a long distance by operating the pumpers in series.

  5. A. Constant Pressure {Equal Distance Method}

  6. Constant Pressure • 1. Each pumper lays same amount • 2. 1000 ft. is common distance • 3. 175 psi E.P. • 4. Attack pumper - constant flow • 5. Attack pumper - dump line

  7. B. Advantages

  8. B. Advantages • 1. No guess work in placement • 2. Minimal calculations {hydraulics} • 3. Fewer pumpers needed

  9. C. Relay Operating Procedures

  10. C. Relay Operating Procedures {Source & Relay Pumpers} • 1. Source pumper gets water • 2. Relay pumper prepares for water • 3. Source pumper opens discharge • 4. Relay pumper engages pump • 5. Relay advances throttle to 175 psi • 6. All relays maintain 20 -50 psi residual • 7. Each pumper duplicates these steps

  11. D. Relay Operating Procedures {Attack Engine}

  12. D. Relay Operating Procedures {Attack Engine} • 1. Establish discharge pressure [N.P.] • 2. All pumpers then set relief valves • 3. Cavatation prevention

  13. E. Shutdown Procedures • 1. Attack engine shuts down first • 2. Shutdown in reverse procedure • 3. Water is allowed to discharge through dump line • 4. Each pumper in line follows reverse shutdown procedure

  14. F. Communications

  15. F. Communications • Like all other fireground operations, good communications are vital to relay pumping.

  16. F. Communications • Separate radio channel early on. • I.C. / Operations • Needs to be modified to suit A.F.D.

  17. F. Communications • Separate radio channel early on. • I.C. / Operations • Needs to be modified to suit A.F.D. • S.O.P.’s ? ? ?