120 likes | 286 Vues
. Agenda. 2. BackgroundThe WELS schemeThe WELS ReviewProject backgroundCost sharing arrangementsIs cost recovery from the private sector appropriate?From whom should costs be recovered?What proportion of costs should be recovered?Funding optionsPrinciples for the design of funding optionsProposed funding options for the WELS schemeDesign considerations for WELS funding options.
E N D