Discussion for the LP endplate

Discussion for the LP endplate. D. P. Peterson Cornell University, Laboratory for Accelerator-based ScienceS and Education . See also: http://w4.lns.cornell.edu/~dpp/linear_collider/LargePrototype.html This project is supported by

charity
Télécharger la présentation

Discussion for the LP endplate

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Discussion for the LP endplate D. P. Peterson Cornell University, Laboratory for Accelerator-based ScienceS and Education See also: http://w4.lns.cornell.edu/~dpp/linear_collider/LargePrototype.html This project is supported by the US National Science Foundation (LEPP cooperative agreement) and an LCDRD consortium grant D. Peterson, “LC-TPC LP endplate”, Valencia ILC Workshop, 07-11-2006

  2. Endplate, 07-2006 As shown in Vancouver, 07-2006… There was some question of the positioning of the field shaping bands relative to the modules. D. Peterson, “LC-TPC LP endplate”, Valencia ILC Workshop, 07-11-2006

  3. Endplate 11-2006 11-2006 ... In the process of transferring the project to a different drafting technician. The endplate is blank, but it is being built up using functionality of the program which allows a more rapid design optimization. D. Peterson, “LC-TPC LP endplate”, Valencia ILC Workshop, 07-11-2006

  4. Field Cage 11-2006 11-2006 ... The field cage, with the Cornell end-flange, is now properly built up from the subcomponents. This will allow more rapid adaptation to the group decisions. D. Peterson, “LC-TPC LP endplate”, Valencia ILC Workshop, 07-11-2006

  5. Assembly 11-2006 11-2006 ... The assembly shows the “endplate” surface in-line with the first field band. This is wrong, and we would like to define this distance at this meeting. D. Peterson, “LC-TPC LP endplate”, Valencia ILC Workshop, 07-11-2006

  6. Endplate/band geometry Martin Killenberg has suggested 26 mm as the maximum module thickness from the endplate surface. This includes: structure 8mm pad plane 2mm 3GEM 6mm GEM gate 10mm sum 26mm. He suggested that all modules, including Micromegas without gate, be made to this thickness. The field bands would be made in-line with this module height. We could do this. One variation is that some of the structure would be below the surface of the endplate. In this sketch, the module rises 22mm above the endplate surface. The endplate surface has been repositioned to be in-line with the edge of the end-flange (which may be metal). File:EndplateFieldCageGeometry1 D. Peterson, “LC-TPC LP endplate”, Valencia ILC Workshop, 07-11-2006

  7. Endplate/band geometry Details from the previous page File:EndplateFieldCageGeometry1 D. Peterson, “LC-TPC LP endplate”, Valencia ILC Workshop, 07-11-2006

  8. Endplate/band geometry The Killenberg geometry places the bands at the surface of the gate. This implies that we would have a different field (relative to the drift field) in the region between the gate and the gas-amplification. This may not be the case. We should decide if we want to maintain the drift field after the gate and, if so, do we want the bands to extend beyond the gate. File:EndplateFieldCageGeometry2 D. Peterson, “LC-TPC LP endplate”, Valencia ILC Workshop, 07-11-2006

  9. Endplate/band geometry The effective end of the bands could be set with electrical taps to the bands. (Representative bands are shown in purple in the drawing.) These could be strategically placed to accommodate the various readout configurations without adding excess height to the modules. Of course, the stand-offs to provide bias potential to the uncovered regions would be tuned for each readout configuration. File:EndplateFieldCageGeometry3 D. Peterson, “LC-TPC LP endplate”, Valencia ILC Workshop, 07-11-2006

  10. Endplate/band geometry If we have specific endplates for each configuration, the height could be tuned with the endplate surface offset. Here, the endplate surface is moved in by 6mm to accommodate the 6mm height difference between a Micromegas module and a 3-GEM module. D. Peterson, “LC-TPC LP endplate”, Valencia ILC Workshop, 07-11-2006

  11. Module locations This shows the 07-2006 layout with 10 modules. The new drafting work is starting with this design but with all modules having the same geometry. However, once the framework is in place to optimize the geometry, it will be a minor effort to redesign with the 7-module (all modules of the same geometry) design. D. Peterson, “LC-TPC LP endplate”, Valencia ILC Workshop, 07-11-2006

  12. Stress relief test piece This shows the first in a series of “stress relief test pieces”. This has been cut with a center opening of 30cm wide. The “mullions” are the same size as proposed in the endplate drawing: 18mm at the widest width, 14mm in depth. This is the first baseline part, with no stress relief. It has been fully measured on a CMM. The mullion position is distorted upward by 500mm (0.020inch). The part is currently cut with 750mm oversize. It will be re-cut to the drawing dimensions, this week, and re-measured. D. Peterson, “LC-TPC LP endplate”, Valencia ILC Workshop, 07-11-2006

  13. Stress relief test piece A close-up of the part shown in the previous slide. D. Peterson, “LC-TPC LP endplate”, Valencia ILC Workshop, 07-11-2006

  14. Module Modifications D. Peterson, “LC-TPC LP endplate”, Valencia ILC Workshop, 07-11-2006

  15. Module o-ring seal D. Peterson, “LC-TPC LP endplate”, Valencia ILC Workshop, 07-11-2006

  16. Endplate/band geometry,09-Nov-2006 D. Peterson, “LC-TPC LP endplate”, Valencia ILC Workshop, 07-11-2006