Straw working group

Straw working group. Introduction. Status and plans 2011. Module 0 The frame is in 154 Straws (report by Neil and Yuriy ) Parts and tooling ready by the end of February 64-straw prototype: Test beam with new web and cover with TDC. (validation!) Electronics

charo
Télécharger la présentation

Straw working group

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Straw working group Introduction Hans Danielsson

  2. Status and plans 2011 • Module 0 • The frame is in 154 • Straws (report by Neil and Yuriy) • Parts and tooling ready by the end of February • 64-straw prototype: Test beam with new web and cover with TDC. (validation!) • Electronics • Shorter web (received), TDC (FPGA), CARIOCA baseline • Interface parts, which means integration • NEW: Micromegashave been ordered for tracking 4x (10x10cm2). Independent tracking for cosmics and test beam. (~ April) Rate >100kHz/cm2 and s ~ 25 mm. Hans Danielsson

  3. Major procurement in 2011 • Straw material (single supplier) 65 kSFr • Frames: DR and Market Survey > 300- kSFr • Interface parts • Workshop on detector Integration Date ? • “Module 0” in September • Tooling (Installation in the experiment) • Gas system • Web, mechanical parts, power supplies etc. First validation with module 0, then series production Hans Danielsson

  4. Milestones in 2011 • Module 0 start-up Feb. 2011 • Finish assembly 1/7/2011 • Straw production start-up in Dubna End of Jan • Interface part “module 0” 1/10/2011 • Assembly site at Dubna ready Jul 2011 • Decision on FE baseline Jan 2011 ->Ok, CARIOCA • Validate TDC on cover (test beam) June 2011 • Synchronization run ??? Nov. 2011 Hans Danielsson

  5. Spares Hans Danielsson

  6. Incident charged particle Gas cathode High voltage 1 Conversion gap E1 e- Micro-grille Avalanche Amplification gap Anode strip E2 Anode plane Working principle High voltage 2 1 ) Conversion stage: Ionization of gas by the charged particle which produces electron-ion pairs.Electrons directed by E1 (0.1 to 1 kV / cm) to the micro-grid, and cross the mesh holes. 2 ) Amplification stage: E2 (≈ 50 kV/cm) >> E1 avalanche, electronsmulitplication. Shuoxing Wu 08-03-2010