1 / 3

Straw Working group meeting

Straw Working group meeting. 22/3/2010. Note at 17:00 we have to change room to 20/1-004. Introduction. New arrivals Antonino SERGI from 1 :st April Flavien BUFFET stage 6/4-23/ 6 64 -straw prototype finished!! There will be a drink in 154 tomorrow at 11: 30

stacia
Télécharger la présentation

Straw Working group meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Straw Working group meeting 22/3/2010 Note at 17:00 we have to change room to 20/1-004 Straw WG, H. Danielsson

  2. Introduction • New arrivals • Antonino SERGI from 1:st April • Flavien BUFFET stage 6/4-23/6 • 64-straw prototype finished!! • There will be a drink in 154 tomorrow at 11:30 • Ready for testing!!! • RD work: • Straw material going on (see separate presentation) • Straw manufacturing and QC (see separate presentation) • Aging studies (Malter effect) work has started • Report in the next meeting • Strawand detector operation with 64-straw prototype to be started. Test beam in June. • Design and TD • Recent progress on interface parts (see presentation by Slava) • Recent progress on chamber design (see presentation by Eric) Straw WG, H. Danielsson

  3. TD Straw WG, H. Danielsson

More Related