1 / 11

Updating the IC process guidance

Updating the intercalibration process guidance Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability. Discussion document sent out 24 September 2008 Current guidance and related documents EEWAI CIRCA folder has been updated

Télécharger la présentation

Updating the IC process guidance

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Updating the intercalibration process guidancePresented byWouter van de BundJoint Research CentreInstitute for Environment and Sustainability

  2. Discussion document sent out 24 September 2008 Current guidance and related documents EEWAI CIRCA folder has been updated Proposed outline of updated IC guidance Practical way forward Updating the IC process guidance

  3. CIS guidance documents 6 and 14 Types manual Class boundary setting protocol Discussion document on comparability of results (draft) Commission Decision Technical reports Guidelines Work plan 2008-11 Current guidance and related documents

  4. Propose to update the existing guidance document, keeping the same structure, taking into account the experiences of the first round of intercalibration Updating the guidance on the IC process

  5. Be more explicit on what IC should achieve HG and GM boundary values of the WFD compliant methods for the BQE What is a WFD compliant method for the different BQE?  explicit criteria Role of the intercalibration network in the exercise (should we aim for a revision at some stage?) Key principles - issues

  6. Simplify the existing options (that have become very confusing) – based on the experience in round 1 Criteria for comparability for the different options Quality control for data sets NEED TO INVOLVE PERSONS WITH HANDS-ON IC EXPERIENCE Process options - issues

  7. BSP was very theoretical, allowing different interpretations in practice Revise BSP taking into account lessons learnt in round 1 IC Challenge to make BSP more practical (without loosing sight its purpose – ensuring consistency with WFD normative definitions) Ensure better consistency in setting of reference conditions  link with ongoing work in the GIGs NEED TO INVOLVE PERSONS WITH HANDS-ON IC EXPERIENCE Class boundary setting procedure

  8. Update using experience of round 1 How to deal with new/updated methods, horizontal issues in the IC reports? Contents of the final IC report

  9. See presentation Sandra Poikane Organisation of the work/timetables

  10. The following timetable is proposed, aimed to have an ECOSTAT agreed guidance document in the spring of 2009: October 2008 – Presentation and discussion of outline and general principles at ECOSTAT (this document); call for nominations for drafting group 15 October 2008 – deadline for drafting group nominations and written comments from ECOSTAT on the outline/general principles 15 January 2009 – First draft guidance document sent out for written comments by ECOSTAT (deadline 30 January) 15 March 2009 – Drafting group completes second draft taking into account the comments 20-21 April 2009 – Discussion (and agreement?) at ECOSTAT meeting Proposed practical way forward

  11. Comments on discussion document/proposed contents of the guidance Comments on proposed timetable for finalising the guidance Volunteers for drafting group? Discussion

More Related