An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MANAGING POWER Smart Governance through Technology • Tushar Pandey • Senior President and Country Head • Public and Social Policies Management Group February 12,2013

  2. Power Sector in India Power Sector in India, is the fourth largest in the world • Per-capita consumption of electricity in India is only about one-fourth of the world average and 404 million people in India do not have access to electricity • Existing grids are constrained and under pressure to deliver the growing demands for power, along with providing stable and sustainable supply of electricity. India loses $68 billion, or about Rs 4,14,800 crore of its Gross Domestic Product due to electricity shortage. India requires a Robust transmission and distribution (T&D) network to increase evacuation capacity and coverage , prevent cascading failures and transmission losses.

  3. Power Sector in India • GENERATION CAPACITY - 2,36,387MW, • India accounts for 4.4% of global energy consumption. • Energy and peak availability shortage is 8.7% and 9%, respectively India’s energy basket indicates heavy dependence on thermal power for production of electricity. • (AT&C) LOSSES were 26.1 • which is HIGHEST when compared against largest power producing countries such as China, Japan , US and Russian Federation • Only 67% of households in India have electricity connection • 45% of rural households do not have electricity connection • DEMAND - 89 GW (12TH FYP) WEAKEST LINK IN THE INDIAN POWER SECTOR Electric power transmission and distribution losses 1% 59% 9% Source: Ministry of Power, GOI Source: World Bank data

  4. Smart Grid: Catalyst for Change A smart grid is an electrical grid with automation, communication and IT systems that can monitor power flows from points of generation to points of consumption (even down to the appliances level) and control the power flow or curtail the load to match generation in real time or near real-time. CAPACITY Meeting the growing demands for electricity- Demand response management system EFFICIENCY Augmenting electricity supply on both new as well as existing systems SUSTAINABILITY Integration of renewable power sources RELIABLE NETWORK Monitor grid stability • Energy accounting and settlements • Real time Grid Operation and Management • Facilitate power evacuation • Improving the country’s energy security by reducing reliance on imported fossil fuels • Bring in economies of scale to support large projects as compared to smaller stand-alone renewable energy projects • Smart Meters • Demand Side Management • Green Buildings • Administering green energy certificates mechanisms IMPACT Meet fast-growing energy needs in a sustainable manner • Increase capacity of existing infra • Leverages SMART GRID’s nationwide transmission • Infrastructure for telecom • Emergency Capacity • Prevent load Shedding and grid failure Defer capital expenditures • Reduced impact on environment • Balance renewable – integrating VRE

  5. Smart Grid Implementation • Generate- • Economic activity, Employment • Demand for Power - Total Power Requirement for DMIC corridor is1,700 MW. The composition is as follows: • • Industrial: 1000MW • • Social: 600MW • • Mixed: 100MW • Greenfield Cities DMIC • 24 new SMART CITIES • Industrial Parks • 11 investment regions • 13 industrial areas • Agro-Processing Zones • Supporting Infra – Rail, Airports, Logistics Facilities, Road GoI Initiative: SMART GRID - 14 pilot projects have been approved by the government. Implemented National Grid Restructured-Accelerated Power Development and Reform Program (R-APDRP) Green Corridor Various missions aimed at promoting growth of RE Implement SMART GRID INFRA to provide reliable supply of power, thereby, improving the economics of operation, encouraging investment and fostering economic growth. Brown-field Implementations Implement through PPP mechanism tailored to each setup BOOT , Concession, VGF etc.

  6. Current Policy Framework • Ministry of Power • formulates the policy structure and takes decisions pertaining to investments in power projects. • Electricity Act, 2003 governs the sector • National Smart Grid Mission • Restructured-Accelerated Power Development and Reform Program (R-APDRP) • State Electricity Boards • own and operate state grid and distribution network • Power Grid Corporation of India Limited (PGCIL) • owns and operates inter-regional and inter-state transmission lines, facilitating transfer of power from surplus to deficit regions. • Private Sector – distribution and power generation

  7. Challenges faced by the Power Sector • Timely implementation of projects • Difficulty in obtaining clearance s • Difficulty in acquiring land • Power Tariff regulation • Regulatory Disputes between center and state • Poor grid discipline • Poor infrastructure – poor evacuation and transmission of power • Pilferage and high AT&C losses • More investment in transmission sector is required

  8. Suggestions • Standardization of the process for award of projects, within specific time-frame. • Single window clearance for Power projects • Frame Antitheft legislation to minimize AT&C losses • Set up regulatory body to minimize project delays due to disputes • Rationalize power tariff to facilitate ‘open access’ and approvals for the same • Establish Demand Response Management • Clear policy framework defining roles and responsibility of both Center and State

  9. Financing • Foster private sector participation: • The Twelfth Plan (2012 - 2017) estimates a total investment of INR 95 BN in developing Smart Grid infrastructure. 50 bn Grants through government 45 bn Private Sector Spectrum of Public Private Partnership Options Private Public Investment Enabler Provider Government

  10. Way Forward Smart Grid Investment • Fostering PPP • Removing entry barriers for smart grid solution providers • Encourage private sector to set up power projects of any size to increase investments and incentive for renovation of existing power plants • Ease out legal process by setting up arbitration cell • Formulate standard agreement for commissioning power projects • Un-bundling or SEBs to bring in transparency, accountability and better management • VGF for promoting private sector to take up projects. • Bring PPP approvals under the RTI Source: ZPRYME

  11. Way Forward • Coordination between various states and center on policy issues and implementation is required to ensure seamless integration of Smart Grid technologies across the country and facilitate stakeholder participation. • Private sector participation would bring efficiency in operations and minimize losses. • Suitable measures to augment financial resources facilitating integration of smart and micro grid needs to be established. Framing and enforcing anti-theft legislation and legal system for speedy resolution of disputes would foster private sector participation in the distribution sector

  12. Way Forward • Stakeholder collaboration • India has a large pool of professionals and experts in the IT and telecom sector which can be leveraged for development of smart and micro grids. • Establishing collaborative community models and fostering empowered consumer base would make way for sustainable power infrastructure. • Human Resource Development • Smart Grids enable the more sophisticated use of the electricity system requiring development of Skill development and Training infrastructure. • 12th FYP envisages a capacity addition of about 1,00,000 MW (including renewable) requiring a work force of the order of 4 lakh out of which nearly 3 lakh will be technical.

  13. Social Equity • Social Equity • Transmission projects face delay due to inability to acquire land • Social Equity Model can facilitate timely implementation of projects by partnering with local community , ensuring their support and equity in project. 2. Community Energy Partnership Program (Ontario, Canada) Ontario’s FIT (Feed In Tariff ) program provides guaranteed purchase of all of the power supplied by renewable energy projects for 20 years (40 years for waterpower) at a fixed price that is high enough to generate a reasonable rate of return. 3. Industries and commercial establishments in Tamil Nadu are letting out their lands or rooftops in return for cheaper solar power. Facilitating Land Acquisition Facilitating synergetic partnerships NGO Government Local Community Contribute Land Structure Social Equity Advisory and PPP implementation Equity in Project Employment Empowerment Knowledge Bank Transmission lines Promoter (Entrepreneur/s or Company) Private Sector Efficiency

  14. Alternate Financing Mechanism Plan • Frame plan to study towards establishing financial viability of smart grid • Increase coverage and Consumer Base • Installing Renewable Energy sources should qualify as PSL • Utilize M-commerce industry for power sector • Branch Correspondents to provide due diligence of co-operative for implementing micro-grid projects Study Incremental Benefit- understanding Smart Grid Value Chain POWER FOR ALL SMART GRID Emissions • Offset cost – • Reduce AT & C losses • Integrate Renewable Sources and hence reduce environment impact • Reduce dependence on fossil fuels • and their imports Govt. Subsidy Kerosene /other fuel sources Meet energy need 404 million people in India do not have access to electricity

  15. Contacts YES BANK Limited Northern Regional Corporate Office: 48 NyayaMarg, Chanakyapuri, New Delhi 110 021 Tel: + 91 11 6656 9000; Fax: +91 11 4168 0144 Public and Social Policies Management (PSPM)Group Tushar Pandey, Senior President & Country Head Northern Regional Corporate Office: 48 NyayaMarg, Chanakyapuri, New Delhi 110 021 Tel: + 91 11 6656 9056; Email-tushar.pandey@yesbank.in About YES BANK YES BANK, India’s new age private sector Bank, is the outcome of the professional commitment of top management team, to establish a high quality, customer centric, service driven, private Indian Bank catering to the “Future Industries of India”. YES BANK has adopted international best practices, the highest standards of service quality and operational excellence, and offers comprehensive banking and financial solutions to all its valued customers. A key strength and differentiating feature of YES BANK is its knowledge driven approach to banking and an unprecedented customer experience for its retail and wealth management clients. YES BANK is steadily building Corporate and Institutional Banking, Financial Markets, Investment Banking, Corporate Finance, Business (SME) and Transactional Banking, Retail Banking and Wealth Management business lines across the country. YES BANK has institutionalized YES International Banking that offers a complete suite of international banking products and services, driven by state-of-the-art technology, which includes Debt, Trade Finance, Corporate Finance, Investment Banking and Business Advisory Services, Treasury and Global Indian Banking. The Bank’s constant endeavor is to provide a delightful banking experience expressed with simplicity, empathy and totality.

  16. Disclaimer YES BANK Limited Registered & Corporate Office: Nehru Centre, 9th Floor, Discovery of India, Worli, Mumbai 400018 Tel: + 91 22 6669 9000; Fax: + 91 22 6669 9018 Northern Regional Corporate Office: 48 NyayaMarg, Chanakyapuri, New Delhi 110 021 Tel: + 91 11 6656 9000; Fax: +91 11 4168 0144 Disclaimer No representation or warranty, express or implied is made as to, and no reliance should be placed on, the fairness, accuracy, completeness or correctness of such information or opinions contained herein. The information contained in this presentation is only current as of its date. Certain statements made in this presentation may not be based on historical information or facts and may be “forward looking statements", and future developments and the competitive and regulatory environment. Actual results may differ materially from these forward-looking statements due to a number of factors, including future changes or developments in the Company’s business, its competitive environment and political, economic, legal and social conditions in India. This communication is for general information purpose only, without regard to specific objectives, financial situations and needs of any particular person. This presentation does not constitute an offer or invitation to purchase or subscribe for any shares in the Company and neither any part of it shall form the basis of or be relied upon in connection with any contract or commitment whatsoever. The Company may alter, modify or otherwise change in any manner the content of this presentation, without obligation to notify any person of such revision or changes. This presentation can not be copied and/or disseminated in any manner.