An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Clock Distributionfor IceCube June 8, 2004 Lawerence Berkeley National Laboratory Gerald Przybylski GTPrzybylski LBNL 10/13/2003

  2. Big Picture ExacTime ET6000 GPS Clock(s) US Naval Observatory(~1E-15 Allan Var. ) UTC Slaved Rubidium Oscillator Inside, < 1x10-11 Allan Var. Master Clock Unit Serial Fan Out Balanced Drivers 1pps 10 MHz (With Oven Crystal option) DOM Hub Equal Length Twisted Pairs; 10 Mhz, 1pps, RS-232; Cat5E with RJ-45s DOM Hub DOM Hub DOM Hub DOM Hub ~90 DOM Hubs IceCube DOMHub Hardware Review and Workshop GTPrzybylski LBNL 6/8/2004

  3. Rubidium Oscillator Allan Variance Figure from http://www.srsys.com/products/PRS10.htm IceCube DOMHub Hardware Review and Workshop GTPrzybylski LBNL 10/13/2003

  4. Rubidium Clock Phase Noise Figure from http://www.srsys.com/products/PRS10.htm IceCube DOMHub Hardware Review and Workshop GTPrzybylski LBNL 10/13/2003

  5. Accuracy and Precision The US Naval Observatory20 Atomic Clock array keeps time to < 2x10-15. GPS SatellitesSynchronized to USNO clock. DOMs more stable than XL GPS clocks40ns RMS; 150ns Peak Error; 3E-10 10 sec Allan variance Radio Propagation Path variationsGPS Receiver Local Oscillator jitter. In House Cable Delays; Fixed Phase ShiftsGPS Clock -to- Master Clock UnitMaster Clock -to- DOM Hub Fan-OutFan-out -to- DOR FPGA FPGA -to- Wire IceCube DOMHub Hardware Review and Workshop GTPrzybylski LBNL 10/13/2003

  6. Inside the DOM Hub Internal, equal length fanout cables Power Supplies Fans Monitors (Possibly Diskless) CPU Clk Fan-Out DOR card DOR card DOR card DOR card DOR card DOR card DOR card DOR card Cable From Master Clock Unit 20 MHz (Orange Twisted Pair) 1 Pulse per Second (Green Twisted Pair) RS-232 Time String (Brown Twisted Pair) IceCube DOMHub Hardware Review and Workshop GTPrzybylski LBNL 10/13/2003

  7. Data Buffer SRAM 2 x 256Kx16 The DOR Card Cable Interface #0 PCI - Core Cable Interface #1 DOM 1..4 Cable Interface #2 Cable Interface #3 DOM 5..8 PCI Bus Altera FPGAEP20K200E 10 MHz DSB: 1-to-8 Slave Clock Fan-out (PCI Card) 20 MHz Aux. Osc. 1 pulse/second Config JTAG Master Clock (Serial) Time String JTAG JTAG Altera PLD EPM7064 FLASH 1M x 8 96 V IceCube DOMHub Hardware Review and Workshop KHS 10-2003 GTPrzybylski LBNL 10/13/2003

  8. Power-filter #1..4 DOR_Rev1, Block Diagram +/-48 V wiredOR Power-sw. #1..4 DOM 1..4 nPON_1..4 nPON_1..4 CommunicationsControllerAlteraEP1C20F400C8 Cable Interface #0 PCI Core Local Bus Cable Interface #1 DOM 5..8 Cable Interface #2 PCI Bus Cable Interface #3 PCI Bus-Ctrl AlteraEP1K50FC256-1 Memory Bus Config JTAG Config JTAG Clock_sel DSB: 1-to-8 Slave Clock Fan-out (PCI Card) 20 MHz Aux. Osc. JTAG 1PPS Serial Master Clock JTAG Config. PLD Altera EPM7128BFC100-10 Data Buffer SRAM 2 x 256Kx16 local Osc. FLASH 2M x 8 PLL QS5LV919 Clock IceCube DOMHub Hardware Review and Workshop K-H Sulanke 6/8/.04

  9. Signaling Issues: • Maximize Noise Immunity in Counting House- Avoid Winter Noise Storms- Avoid Motor Noise, Welder Noise, etc… • Minimize EMI and RFI- Computers and Instruments • Proven Technology- Price- Component Availability- Track Record IceCube DOMHub Hardware Review and Workshop GTPrzybylski LBNL 6/8/04

  10. Master Clock to DSB Like 802.3 RS-485 IceCube DOMHub Hardware Review and Workshop GTPrzybylski LBNL 6/8/04

  11. DSB to DOR LVDS IceCube DOMHub Hardware Review and Workshop GTPrzybylski LBNL 6/8/04

  12. Master Clock Features[PY03, this year] • Single ET6000 (Xtal, or Rubidium?)- OCXO: 10 Sec Allan Variance 2E-11, -120 dBc/Hz Phase Noise - Rubidium: 10 Sec Allan Variance 1E-11, -91 dBc/Hz Phase Noise • 10 MHz from Half the Optional Outputs- Drive LEMO Inputs through coax • 1 Hz from Half the Optional Outputs- Drive LEMO Inputs through coax • RS-232 from (DTR) DB-9- Daisy-Chain cable • Cold Spare in Rack • Heated “Radome” on TCH Roof (>-40°C) IceCube DOMHub Hardware Review and Workshop GTPrzybylski LBNL 6/8/04

  13. PY03 Deployment Temporary Counting House GPS Clock (Hot) BOM: GPS Clock 4 identical BNC to LEMO cables (10 MHz) 4 identical BNC to LEMO cables (1 PPS) 1 Serial daisy-chain cable (Time String) Antenna Heater Serial Port cable DOM Hub, String 0 DOM Hub, String 1 DOM Hub, String 2 DOM Hub, String 3 10 MHz 1 PPS IceCube DOMHub Hardware Review and Workshop GTPrzybylski LBNL 6/8/04

  14. Master Clock Features[Post PY03] • Multiple GPS clock inputs (?)- Fail-over (?); Voting (?) • Status display (?)- Local Time display- Fault indicator- Fault Reporting- Selected Clock • Clock Relay Port feeding back to MAPO (?)- Supply AMANDA with the IceCube Ref Clock • CPU Monitoring Functions via POE, or CAN (?)- Voltages, Temperatures, Fans- CPU Reset; Power on/off IceCube DOMHub Hardware Review and Workshop GTPrzybylski LBNL 6/8/04

  15. Summary • DSB to DOR card Functionality Demonstrated • GPS clock Drive to DSB demonstrated • Firmware under development (Sulanke) possible involvement by LBNL too… • DSB usable, as is, at the Pole for first deployment • Oven Crystal GPS Clock in hand (ExacTime ET6000) • Simplified Deployment Plan Exists for this year. IceCube DOMHub Hardware Review and Workshop GTPrzybylski LBNL 6/8/04